Similar Projects
Port of Oakland Remote Operations Upgrades
Alteration
Bidding
Oakland, CA 94607

Livermore Village Parking Garage Construction - Phase 1 - Trash Enclosure and Surface Lot Project
Infrastructure, Alteration
Bidding
$1,500,000 to $1,750,000 est. value
Livermore, CA 94550

Install lighting system
Infrastructure
Post-Bid
$3,010,000 est. value

HVAC Installation and Energy Infrastructure
Alteration
Post-Bid
Union City, CA

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Standby Power Generation System Upgrade
Alteration
Results
Union City, CA

Install a Diesel Generator on Trailer
Alteration
Post-Bid
Dublin, CA 94568

Photo-Voltaic (PV) System Maintenance and Repair Services
Alteration
Results
CA

As Needed Repair Services for Medium Voltage Systems
Alteration
Post-Bid
Livermore, Pleasanton, CA 94550

15KV Copper Cable, EPR, 175 MIL, Strand Filled, Single Conductor, JCN (3 types)
Term Contract
Results
Alameda, CA

Eaton 9E-40-60 Eaton UPS Battery Replacement
Term Contract
Post-Bid
Berkeley, CA 94710

Install Three Wall Mounted Maintenance Bypass Panels
Alteration
Post-Bid
Albany, Berkeley, CA 94710

Energy Efficiency On Call Services
Alteration
Post-Bid
Berkeley, CA 94704

Repair of Emergency Generator EDG-4
Term Contract
Post-Bid
Albany, CA

Electrical, Plumbing, Painting, Landscaping and Tree Services
Term Contract
Post-Bid
Oakland, CA

Last Updated 05/03/2022 10:46 AM
Project Title

Building Electrification, Electric Vehicle Charger, and Low Carbon Concrete Building Code Assistance

Physical Address View project details and contacts
City, State (County) Dublin, CA   (Alameda County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work include Measure CF-1, Measure EE-1, Measure SM-1, and Measure MM-2. Staff anticipates that City Council will adopt a Resolution in April to request the East Bay Community Energy (EBCE) Board to default non-residential accounts to EBCE’s Renewable 100 electricity. If approved, the transition would occur in October 2022. Assistance with outreach to non-residential accountholders regarding the transition is desired. Work related to Measures EE-1, SM-1, and MM-2 will be coordinated with the City’s Building and Safety Division as part of the 2022 Building Code update.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents