Similar Projects
Street Reconstruction - Fairway Drive and Savell Drive
Infrastructure
Bidding
$4,750,000 est. value
TX 77521

HPW - 72-Inch WL Along Kipling, Woodhead & Branard
Infrastructure
Bidding
$33,950,000 est. value
Houston, TX

State Highway 225 12" Waterline Project, Phase II
Post-Bid
Pasadena, TX 77506

Water, Sanitary Sewer and Drainage Facilities to Serve Jasmine Heights Sections 18 and 19
Post-Bid
TX

Smart Water Meter System
Results
TX

Construction of Proposed Wastewater Lift Station No. 2 and 6" Force Main Serving Anderson Lake Development
Results
TX

Meadowgreen Section 1 Drainage Improvements
Infrastructure
Bidding
Houston, TX 77062

12 Inch Flange L and W Check Valve
Post-Bid
Houston, TX

SWSP - Segment C
Results
$121,900,000 est. value
Houston, TX 77002

Valve Replacement Project
Infrastructure
Bidding
West University Place, TX

Construction of the Taylorcrest Court Waterline Extension
Post-Bid
Less than $100,000 est. value
Bunker Hill Village, TX 77024

SWSP - Segment B3
Results
Houston, TX 77002

Construction of Dunham Pointe Section 7 Water, Sanitary Sewer, and Storm Sewer
Infrastructure
Bidding
TX

Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Katy Lakes Section 5
Post-Bid
TX

Water and Sanitary Facilities for Big John Street
Results
Less than $198,996 est. value
Spring, TX 77383

Reported 02/25/2022 12:00 AM
Project Title

Project D - Water Line Improvements

Physical Address View project details and contacts
City, State (County) Shoreacres, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This will include replacement of approximately 11,100 LF of existing water distribution pipe throughout the City that are 8-inches in diameter or smaller that have have ongoing maintenance issues. This work will include replacement of water services, valves, fire hydrants, wet connections rehabilitations, and pavement repair. In addition, alternative water line areas have been designed if funds are available including approximately 850 LF as Alternative #1, approximately 875 LF as Alternative #2, approximately 850 LF as Alternative #3, and approximately 900 LF as Alternative #4.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents