Similar Projects
Utilities - US 62
Infrastructure
Conception
$1,000,000 CJ est. value
Muskogee, OK 74401

Utilities - US 62
Infrastructure
Conception
$1,000,000 CJ est. value
Muskogee, OK 74401

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Utilities - US 62
Infrastructure
Design
$250,000 CJ est. value
Muskogee, OK 74401

Campus-wide Parking Lot Repairs
Infrastructure
Bidding
$45,000 CJ est. value
Warner, OK 74469

Micro-surfacing Southeast Zone 2023
Infrastructure
Bidding
$720,000 CJ est. value
Muskogee, OK 74401

Webbers Falls Public Schools - 2023 Bond Project
New Construction, Infrastructure - 2,960 SF
Sub-Bidding
$2,000,000 CJ est. value
Webbers Falls, OK 74470

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Muskogee Port Access Road Extension
Infrastructure
Post-Bid
$340,000 est. value
OK

Water Line Leak Repair, Fire Hydrant Replacement and Street Cut Repair
Infrastructure
Results
$1,120,000 est. value
Muskogee, OK

Industrial Access Road Extension Smith Ferry Road and South 24th Street John T. Griffin Industrial Park
Infrastructure
Results
$4,168,895 CJ est. value
Fort Gibson, OK 74434

St. Francis - Enabling Construction Projects
Renovation, Infrastructure - 8,220 SF
Construction
$1,515,000 CJ est. value
Muskogee, OK 74401

2019 Bond - Early Childhood Center - Muskogee Public Schools
New Construction, Infrastructure, Renovation
Pending Verification
$6,000,000 CJ est. value
Muskogee, OK 74401

Whataburger / Muskogee
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Muskogee, OK 74401

Right of Way - SH080
Infrastructure
Conception
$1,000,000 CJ est. value
Fort Gibson, OK 74434

Last Updated 09/21/2023 03:31 AM
Project Title

E. Smith Ferry Road Off-Right-Of-Way Drainage Improvements - Detention Pond

Physical Address View project details and contacts
City, State (County) Muskogee, OK 74403   (Muskogee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $530,153 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: E. Smith Ferry Road Off-Right-Of-Way Drainage Improvements - Detention Pond Culverts, Waterways, Stormwater Channels, Drainage, Dredging, Ditches and Canals, Box Culvert, Drainage Furnishing all labor and materials and performing all work necessary for: E. Smith Ferry Road Off-Right-Of-Way Drainage Improvements - Detention Pond No bids received Questions regarding bids shall be directed to Jacob Burton, P.E., consulting engineer at (405) 242- 6625. Question Deadline 08/05/2023

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents