Similar Projects
Reported | 07/13/2022 01:00 PM |
Project Title | SW Fairlawn Road from 23rd Street to 29th Street - 701040 |
Physical Address | View project details and contacts |
City, State (County) | Topeka, KS (Shawnee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Conceptual Design, Construction Start Expected September 2025 |
Bids Due | View project details and contacts |
Estimated Value | $1,446,500 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Paving for a road / highway in Topeka, Kansas. Conceptual plans call for paving for a road / highway. The SW Fairlawn project will rehabilitate the stretch of SW Fairlawn from 23rd to 28th street. The stretch of SW Fairlawn from 28th to 29th was reworked with the Wheatfield Village project in FY2019 and is not included in the scope of this project. The plan is to rehabilitate the existing lanes of SW Fairlawn between 23rd and 28th and widen SW Fairlawn at 25th street to allow for the addition of a dedicated turn lane at 25th. New traffic signals will also be installed at this intersection to replace the current signals. This project is funded with a combination of citywide 1/2 cent sales tax and general obligation bonds. The citywide funding will be used to replace existing pavement and the general obligation bond funding will be used for road widening, signals, and stormwater improvements as these are not a permitted use of the citywide funding. The FY2020-2029 CIP showed the project design starting in FY2024, however, the FY2021-2030 CIP moved the project up to FY2023 as there are significant stormwater issues that need to be addressed. As of July 12, 2022, this project is currently in the FY 2023-2032 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |