Similar Projects
Lloyd Auman Elementary School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28304

Warrenwood Elementary School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28311

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

Anne Chesnutt Middle School and Morganton Road Elementary School, HVAC Infrastructure
Results
Fayetteville, NC 28303

Morganton Road Elementary School, Kitchen HVAC Addition and Building F HVAC Unit Replacement
Results
Fayetteville, NC 28303

Rockfish Elementary School HVAC and Window Replacement
Alteration
Bidding
Hope Mills, NC 28348

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Benjamin Martin Elementary School and Ponderosa Elementary School Kitchen HVAC Additions
Results
Fayetteville, NC 28303

Gray's Creek Elementary School HVAC and Window Replacement
Alteration
Bidding
Hope Mills, NC 28348

Garage Air System Repair
Alteration
Post-Bid
Fayetteville, NC

South View High School Admin A/C Replacement
Results
Hope Mills, NC 28348

EE Smith Science Class Rooms AC Replacement
Alteration
Post-Bid
Fayetteville, NC 28301

C Wayne Collier Cafeteria A/C Replacement
Results
Fayetteville, NC 28305

College Lakes Package AC Replacements for Buildings 2,3 and 5
Alteration
Post-Bid
Fayetteville, NC 28311

Last Updated 01/20/2022 10:23 AM
Project Title

Replace Kitchen AC at Westarea Elementary School

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28301   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors are to install two 3 ton Fujitsu mini split heat pumps with wall mounted air handlers. Contractors will mount air handlers on window panels that will be installed by CCS. Condensers will be mounted on a pre fab wall brackets that are rated for their weight. Brackets are to be installed according to manufacturer specifications. Contractor will run power from the existing electrical outlet box to new disconnect boxes located near the condensers. The existing outlet box shall be changed to a disconnect box. Contractor to install new control power wire, line set and drain that will be covered with approved cover and installed in a straight, squared manner. The drains from both units shall be connected together and run to a new condensate pump supplied by the contractor. The condensate pump shall be located in the same place as the existing pump. Contractors will supply all equipment, condensate pump, wiring, disconnects, line set and cover, unit wall brackets and drain line as required for a complete working system. Contractors are responsible for all permits and inspections.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents