Similar Projects
Shining Mountain Waldorf School - Master Plan - 11.6 acres
New Construction, Addition - 146,596 SF
Conception
Boulder, CO 80304

Costco / Longmont
New Construction, Infrastructure - 150,000 SF
Conception
$12,000,000 CJ est. value
Longmont, CO 80501

Murphy Express #8635 / Louisville
New Construction, Infrastructure - 2,800 SF
Design
$2,500,000 CJ est. value
Louisville, CO 80027

The Ridgeway Science & Tech
New Construction, Infrastructure - 112,000 SF
Design
$65,000,000 CJ est. value
Boulder, CO 80301

RFP Construction Manager at Risk - Town Hall Expansion
Addition, Demolition, LEED Certification, Build-out, Renovation, Infrastructure - 20,000 SF
Bidding
$2,500,000 CJ est. value
Erie, CO 80516

RFQ - Homes on Hover (Name TBD)
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Longmont, CO 80501

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Willoughby Corner - CB1 & Senior Building
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Lafayette, CO 80026

Design Build Services for Cottonwood Park Playground Replacement Project
New Construction
Results
Louisville, CO 80027

PKAA, Caribou Park Project
Infrastructure
Results
$150,000 to $170,000 est. value
Nederland, CO

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Grace Commons Church
Addition, Demolition, New Construction, Infrastructure - 104,873 SF
Pending Verification
$45,000,000 CJ est. value
Boulder, CO 80302

Main Street Hotel / Lyons
New Construction, Infrastructure - 50,000 SF
Pending Verification
$15,000,000 CJ est. value
Lyons, CO 80540

RFQ Contractor - General Contracting Firms
Renovation, Infrastructure
Conception
$300,000 CJ est. value
Lyons, CO 80540

Quail Commercial Center
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Longmont, CO 80503

Last Updated 11/14/2022 04:04 PM
Project Title

RFP Construction Manager - Potts Field and Prentup

Physical Address View project details and contacts
City, State (County) Boulder, CO 80303   (Boulder County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $5,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

University of Colorado athletic department is renovating Potts Track and Prentup Field. There are multiple distinct project scopes that are being advertised for CM/GC services under this RFP solicitation. The University at its sole discretion may award these projects to one or multiple contractors. Construction start is anticipated for Spring 2023 and completion by August 2023 prior to the 2023 fall soccer season at Prentup field and the 2024 PAC12 track and field championship at Potts track. High level project details are as follows: Prentup Field Lighting o Install new field lighting at the perimeter of soccer field o Install speakers to the proposed light poles to provide a permanent sound system o Provide improvements to support media broadcasting o Modify irrigation system and replace field sod Potts Track Renovation o Replace track surface and modify existing track cross slope to reflect NCAA standards. Extent of subgrade modifications to be determined after analysis. o Various track and field modifications to accommodate the needs of CU Athletics Restroom and Concessions Building and Ski Building Restroom Renovation o Approximately 3000SF new mixed-use concessions, storage and restroom building between Prentup and Potts Fields o Reconfigure existing ski building restroom with revised stall layouts and entrance location o New ski building restroom finishes to update space For purposes of this solicitation, assume the following for anticipated construction costs for each project. UCB000687 - Prentup Field $2.0M UCB000686 - Potts Track $2.5M UCB000712 - Concessions Building $1M Date Email Questions Due September 30 th , 2022 @ 2PM Date Email Answers Issued October 5 th , 2022 Anticipated Construction Start/Finish April 2023 - December 2023 Respondent initiated email requests for clarification will be received any time on or before to September 30 th , 2022 @ 2PM. All State responses will be issued by email addenda on or before October 5 th , 2022 @ 2PM.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents