Similar Projects
South End Development (1901 S. Trumbull St.) - Bay City
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Bay City, MI 48708

Aldi / Alpena
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Alpena, MI 49707

Library Addition - Elk Rapids District Library
Addition, Infrastructure - 6,320 SF
Design
$1,800,000 CJ est. value
Elk Rapids, MI 49629

RFP - Bridge Street Housing Project
New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Elk Rapids, MI 49629

Bid Package #3 - L.E. White Middle School Tennis Court Renovation
Renovation
Bidding
$500,000 CJ est. value
Allegan, MI 49010

New Learning Center (Playground Equipment only)
New Construction
Post-Bid
Middleville, MI

Turf Football Field and Track Resurface Project
Renovation
Post-Bid
Less than $1,200,000 est. value
Bay City, MI 48706

Harbert Community Park Phase 1 Improvements
Renovation
Results
Harbert, MI

2022 Tennis Court Project
Renovation
Results
$350,000 est. value
Bridgman, MI 49106

2022 Whippoorwill/Greenwood Street Sanitary Sewer and Water Main Improvements and Village-Wide Sanitary Sewer CIPP Project
Infrastructure
Construction
$787,414 CJ est. value
Middleville, MI 49333

CBS Concrete Replacement
Infrastructure
Construction
$597,726 CJ est. value
Bay City, MI 48708

Lakeland Elementary School Improvements - Bond 2020 - Elk Rapids Public School
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Elk Rapids, MI 49629

Alcona County Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Lincoln, MI 48742

Bingham Apartments / Hope Network Affordable Independent Living & Services
Addition, Demolition, Infrastructure, Build-out
Design
$8,000,000 CJ est. value
Alpena, MI 49707

Park Trail Project
Infrastructure
Bidding
$620,000 CJ est. value
Auburn, MI 48611

Last Updated 05/23/2023 06:34 AM
Project Title

Elberta Lake Michigan Beach Park Improvement Project

Physical Address View project details and contacts
City, State (County) Elberta, MI 49628   (Benzie County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $546,999 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 22, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Items of work include removals, site preparation and grading, soil erosion measures, new concrete trails to provide Universally Accessible access to the park, reconstructed timber path, mobi-mat sections in portions of the pathway, aggregate parking areas, prefabricated vault toilet, pavilion, wood split rail fencing, parking area lighting, concrete sidewalk, concrete bumper blocks, beach grass planting and all related work. Bid alternate items include a full flush prefabricated restroom, drain field and well. Prospective Bidders may request the Bidding Documents from the Issuing Office. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Bids will be accepted only from Plan Holders of Record. In order to be a Plan Holder of Record, Bidding Documents must be obtained from the Issuing Office. For questions, contact: Ken Mlcek, PE., (231) 218-0168, kmlcek@fveng.com. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00am - 5:00pm and may examine the Bidding Documents from the Issuing Office as described at the following locations: Fleis & VandenBrink Engineering, Inc., 603 Bay Street, First Floor, Traverse City, Michigan 49684 Village of Elberta Office, 151 Pearson Street, Elberta, MI 49628 Davis-Bacon Federal Wage rates are not required. Contractors performing work on the project must comply with all requirements of 1976 PA 453 (Elliott-Larsen Civil Rights Act) and 1976 PA 220 (Persons with Disabilities Civil Rights Act), as amended. The project is funded by Michigan DNR Trust Fund Program, relevant state and federal requirements apply. The contractor and all subcontractors must comply with all requirements of 1976 PA 453 (Elliott-Larsen Civil Rights Act), the 1976 PA 220 (Persons with Disabilities Civil Rights Act), and Executive Directive 219-09, as amended. In accordance with these laws, all contracts the Village enters into must contain a covenant by the contractor and any subcontractors not to discriminate against an employee or application for employment with respect to hire, tenure, terms, conditions, or privileges of employment, or a matter directly or indirectly related to employments, because of race, color, religion, national origin, age, sex, height, weight, marital status, partisan considerations, or a disability or genetic information that is unrelated to the individuals ability to perform the duties of a particular job or position. The Village of Elberta reserves the right to accept any bid, reject any or all bids, to waive informalities and make the award in any manner deemed in the best interest of the Village of Elberta

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents