Similar Projects
B430 Cooling Tower Sump Pump Repair
Infrastructure
Bidding
Aurora, CO 81611

B430 Cooling Tower Sump Pump Repair
Infrastructure
Bidding
Aurora, CO 81611

Air Conditioning - Design Build
Post-Bid
Boulder, Louisville, CO

Heating, Air Conditioning, Ventilation Maintenance and Repair Services
Term Contract
Post-Bid
Aurora, CO 80012

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

Notice 20-01-Rfp-Umc-Bldg-Recommissioning
Results
Less than $800,000 est. value
Boulder, CO

J041--OCC-Data Center A/C Repairs Pop: 09-25-2020 To 09-24-2021
Post-Bid
Denver, CO 80209

Warehouse Evaporative Coolers Install
Results
Less than $50,000 est. value
Loveland, CO 80537

Districtwide Refrigeration Maintenance and Repair Services
Post-Bid
CO

Air Conditioning Units
Results
Denver, CO 80203

CU Denver PN20-112394 - SCPP Only
Alteration
Post-Bid
$125,000 est. value
Denver, CO 80204

Annual HVAC Maintenance
Term Contract
Results
Less than $135,000 est. value
Denver, CO 80230

Multi School Exhaust Fan Replacement
Infrastructure
Post-Bid
Denver, CO 80223

Chillers/Cooling Tower Replacement
Results
Greeley, CO

Refrigeration Maintenance and Service
Term Contract
Post-Bid
CO

Last Updated 09/08/2021 03:22 PM
Project Title

HVAC System at Downey Elementary/Administration

Physical Address View project details and contacts
City, State (County) Cortez, CO 81321   (Montezuma County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor responsible for developing a design in accordance with plan review by District, Empire Electric and in adherence with state and local building codes. Consultation should be made with District regarding the presence of asbestos containing materials. Bid to include all labor, materials and equipment to: 1. Replace existing air handler with new energy efficient roof-top unit to meet or exceed building square footage -central controls 2. Install additional ducting to service gym 3. Install 2 mini-split units to service basement (2200 sq. ft.) 4. All necessary plumbing and electrical hookups 5. Necessary permitting and line locates 6. Use of certified asbestos-free components and materials 7. System training upon project completion 8. Adhere to manufacturer’s specifications for all phases of installation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents