Similar Projects
Mary Gibbs Tile Reconstruction
Infrastructure
Bidding
Danville, IN

2022 Maintenance of all Urban Regulated Drains
Term Contract
Bidding
Noblesville, IN

Trench Box Rental
Post-Bid
Indianapolis, IN 46077

48" Precast Reinforced Concrete Pipe
Post-Bid
Indianapolis, IN 46077

Polymer Precoated Corrugated Steel Pipe and Couplings
Results
Indianapolis, IN 46077

2020 Addison Street Drainage Improvements
Renovation
Results
Crown Point, IN 46307

Springfield Road Culvert Replacement
Construction
Mount Vernon, IN

Riverside Drive Bank Stabilization
Infrastructure
Bidding
South Bend, IN 46624

Culvert Replacement
Post-Bid
Greenfield, IN

Greenfield Avenue Culvert Over Lehr Ditch
Results
Noblesville, IN 46060

Bullerman-Blockage Removal
Infrastructure
Bidding
Fort Wayne, IN

Lake Lemon Sediment Improvement
Post-Bid
$1,500,000 to $2,000,000 est. value
Unionville, IN

Steel Sheet Piling
Results
Indianapolis, IN 46077

Drainage Structures 2021
Post-Bid
Paoli, IN

North Washington Road Drainage Improvements
Results
Fort Wayne, IN 46800

Last Updated 11/08/2021 09:41 AM
Project Title

Gary Miller Open and Tile Reconstruction

Physical Address View project details and contacts
City, State (County) Logansport, IN   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Tile Reconstruction- 4,380 linear feetof 36" HDPE and 750 linear feet of 30".

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents