Similar Projects
HVAC Maintenance and Repair
Alteration
Bidding
Atlanta, GA

PTAC Installation for Piedmont North B Residence Hall
Alteration
Bidding
Atlanta, GA 30303

Clarkston Campus CD Building Install Screw Chiller and Replace AHU Cooling Coil
Post-Bid
Less than $910,000 est. value
Atlanta, GA 30302

City Hall HVAC Purification System
Post-Bid
Alpharetta, GA 30009

Design Build Services for The Replacement/Refurbishment of AHUs and Associated Fans
Results
GA

Rialto and Haas-Howell HVAC Upgrades
Results
Less than $850,000 est. value
Atlanta, GA 30302

HVAC Services
Alteration
Bidding
GA

HVAC and Mechanical Products
Term Contract
Post-Bid

Maintenance of Supplemental Cooling Systems
Term Contract
Results
Atlanta, GA 30334

Southwest Arts Center Theater HVAC/Chiller Replace
Alteration
Bidding
Atlanta, GA 30331

Replace Boiler and Cooling Tower at Douglass High School
Post-Bid
Atlanta, GA 30318

HVAC Maintenance and On-Call Services
Results
Milton, GA

Replace Gymnasium HVAC Units at Washington High School
Post-Bid
Atlanta, GA 30314

HVAC Filters and Related Supplies
Results
Atlanta, GA

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Last Updated 04/11/2022 09:54 AM
Project Title

Sandtown Gym HVAC Repair/Replacemen

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30331   (Fulton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing (4) ceiling hung Gas unit heaters. Provide new (4) 7.5 Ton Trane Roof Top Unit gas package units that provide heating and cooling. Provide lifting equipment as needed to install RTUs. Provide (4) curbs to properly support Roof Top Unit as required by manufacturer's specifications. See exhibit A for an engineering recommendation. Contractors are required to perform their own assessment before commencing work. Provide supply and return air components as necessary per manufacturer’s specifications. Provide and install programmable thermostat(s) control as needed for systems to operate properly. Provide electrical power for HVAC unit from existing electrical systems, including installation of panel, breakers, receptacles and wiring necessary for system to properly operate. Provide gas supply with corresponding Isolating valves to all RTUs. Contractor shall coordinate necessary penetrations with the roofing Contractor, Garland/DBS, Inc. Garland shall perform all necessary roofing penetrations needed for the installation of the RTUs. All condensation draining pipes properly secured, all pipes extended to the gutter to discharge onto gutter. Clean area of all construction debris. Test system for proper operation and review installation with Owner. Provide Floor protect as needed to perform work and install new system. The Contractor should include all necessary materials, components, connections, and equipment needed for the completion of the HVAC systems and their proper operations. As well as to complete the work, including but not limited to those items needed to access the work areas in order to complete the work. Such as lifts, cranes, hoists, scaffolding, etc.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents