Similar Projects
Lloyd Road Water Main Replacement
Bidding
$850,850 est. value
Marlboro, NJ

Replacement of Water Conditioning System
Infrastructure
Bidding
$500,000 est. value
Newton, NJ

Water Treatment Services
Post-Bid
Cherry Hill, Stratford, NJ 08028

Supply of Water Meters
Post-Bid
Marlboro, NJ

Emergency Water Main Repair
Results
Randolph, NJ

Water Main, Sanitary Sewer and Storm Water Facility Repairs
Results
Fair Lawn, NJ 07410

Hoboken Water Utility - Advanced Pressure Monitoring
Infrastructure
Bidding
Hoboken, NJ

Water and Sewer Improvements on Baltimore Avenue, Wyoming Avenue and Lafayette Avenue
Post-Bid
Ventnor City, NJ 08406

Lead Service Line Replacement Program Phase X (B)
Results
Newark, NJ 07102

Roscoe Hall Chilled Water Piping Replacement Project
Infrastructure
Bidding
$250,000 est. value
Ewing Township, NJ 08628

Church and Academy Street Water Main Improvements
Infrastructure
Post-Bid
Rockaway, NJ 07866

Molly Ann Pump Station Valve Replacement
Results
North Haledon, NJ 07508

Furnish and Deliver Gate Valves and Appurtenances
Infrastructure
Bidding
New Brunswick, NJ

On-Site Leachate Forcemain Improvements
Infrastructure
Post-Bid
Swedesboro, NJ 08085

Valves
Results
Vineland, NJ 08360

Last Updated 07/11/2022 09:06 AM
Project Title

Church Street (Base Bid A) and New Street (Base Bid B) Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) High Bridge, NJ   (Hunterdon County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project improvements are proposed along Church Street (Base Bid 'A'), as well as Taylor Street, Prospect Street, Thomas Street and New Street (Base Bid 'B'), and will include installing new 8" and 6" water main, installing valves and hydrants, connection of services, abandonment of old main and paving of the trench. All work on this contract must be completed within 30 calendar days from issuance of a Notice to Proceed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents