Similar Projects
Crystal Packaging Inc
Renovation - 71,000 SF
Conception
Henderson, CO 80640

East Fountain Apartments
New Construction - 82,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Colorado Springs, CO 80916

Lead and Copper Testing/Collection Louisville Water Treatment Plants
Alteration
Bidding
Louisville, CO 80027

Region 1 Project Specific I-70 Over Harlan Bridge Replacement Cm, Ci And Mt
Infrastructure
Bidding
Denver, Wheat Ridge, CO 80212

Construction Management, Inspection, Materials Testing for 30th Street Widening
Post-Bid
Colorado Springs, CO 80903

Asbestos Abatement
Post-Bid
Montrose, CO 81401

Notice Concerning Prequalification for Large Construction Projects
New Construction
Results
$100,000 est. value
Lakewood, CO 80215

Construction Materials Testing and Inspection Services for New City Facility
Results
CO

Kechter Farm Mixed-Use Townhomes
New Construction - 186,000 SF
Pending Verification
$10,000,000 CJ est. value
Fort Collins, CO 80528

TopGolf - Colorado Springs
New Construction
Pending Verification
Colorado Springs, CO 80910

Statewide Program Specific Off-System Bridge Inspection Engineering Services
Post-Bid

R2 PS I-25 Exit 11 Interchange Justification Construction Management
Term Contract
Results

Low Zone Tank Painting Inspection Services
Alteration
Post-Bid
Northglenn, CO

Region 2 Project Specific SH 21 (Powers) and Research Interchange Construction Management, Inspection and Materials Testing Engineering Services
Results
CO

Conveyance Inspections for All-City (Excluding Denver International Airport)
Term Contract
Post-Bid
CO

Reported 12/30/2021 12:00 AM
Project Title

Environmental Assessment

Physical Address View project details and contacts
City, State (County) Towaoc, CO   (Montezuma County)
Category(s) Professional Services, Single Trades
Sub-Category(s) Environmental, Inspection Services
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The following tasks are performed to provide environmental assessment Phase 1 and Phase 2 for hazards. a) Review record, to discover whether the building has been used for potential hazardous purposes in the past. b) Visual inspection of the property’s current condition, with comparison to the site around building. c) Visual inspection of adjoining properties as needed. d) Interviews with current property owners, operators, occupants, and local government officials. e) Soil and water sampling for sign of contamination. f) Comparison of lab results with local, state, and federal regulatory guidelines. g) May include inspection of interior spaces for mold, radon and lead paint. h) Contractor shall be required to make arrangement to remove/dispose of all/any debris, used for sampling when inspection work is in progress, after work is completed, debris and solid waste will be disposed of

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents