Similar Projects
SR 1036 Pipe Replacement
Results
$500,000 to $999,999 est. value
PA

Honey Hole Road Structure Replacements - CB54717, CB54718 and CB54719
Results
Wilkes-Barre, PA

East 10th Street Trench Restoration
Results
Berwick, PA 18603

Allendale Swale Repair
Results
Hanover Township, PA 18109

Lake Association Pavilion - Drainage and Landscaping Construction
Post-Bid
Mountain Top, PA 18707

Walnut Street Culvert Replacement
Results
Dupont, PA

Washington Street Pave and Drainage Project
Results
Exeter, Pittston, PA 18643

Meeker Road Culvert Replacement
Results
$90,000 est. value
Lehman, PA 18627

Tilbury Road Slope Stabilization Project
Results
Less than $20,000 est. value
Plymouth, PA 18651

LSA 4th Street Dennison and Monument Avenue Street Improvement Project
Results
$422,428 est. value
Wyoming, PA 18644

D and L Rail Trail Wilkes-Barre Mountain Section Phase I
Results
Wilkes-Barre, PA 18701

Haines Street Drainage Improvements
Results
Plains, PA 18705

State Game Lands #183 Shooting Range Improvements
Post-Bid
Palmyra, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Construction of the Conyngham Agricultural BMP Project
Results
$50,000 to $75,000 est. value
Dallas, PA 18612

Last Updated 11/06/2020 08:03 AM
Project Title

Drainage Improvments

Physical Address View project details and contacts
City, State (County) Plymouth, PA 18651   (Luzerne County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Drainage Improvements shall consist of inlets, headwalls, storm sewer and swales to effectively collect and convey upstream drainage areas to the SWM Basin. Inlets/piping network will be installed in the roadway, alleys and driveway areas. Swales will be in the unimproved wooded areas to the creek. SWM/BMP'S: Stormwater Management / Best Management Practices shall be implemented to control runoff, silt deposits and water quality. Improvements will be a basin with controlled outlet, sumps in the piping network and aprons and forebay plantings for water quality.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents