Similar Projects
Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP)
Post-Bid
$700,000,000 est. value

Submit a Quote to Provide, Install, and Maintain a 10GB Wave Service Between Room 1702 (CCER), 9555 NW 33rd St, Doral, FL., and Bldg 570, Room DI-1, 7115 South Boundary Blvd, Tampa, FL 33621.
Post-Bid
Doral, Tampa, FL

Blanket Purchase Agreements for Local Exchange Telecommunications Services (CSAS)
Results

To Procure Telecommunications Services and Equipment.
Results

58--Pelco Cameras
Post-Bid
Miami, FL 33125

407th AFSB LRC Miami Warehouse Electronic Security System Upgrade and Monitoring Services
Results
Miami, FL 331721217

Electronic Key and Access Control System for Intelligent Transportation System Field Cabinets
Post-Bid

Purchase of Security Equipment, Maintenance, and Repair Services
Results
FL

National Physical Security (NPSP) Maintenance and Installation
Post-Bid
Less than $29,000,000 est. value

Intercom, Master Clock and PA Sound Systems
Term Contract
Results
Miami, FL

CCTV Camera Equipment, Maintenance and Repair Services Pre-Qualification
Term Contract
Post-Bid
Miami, FL 33128

Submit a Quote to Provide, Install, and Maintain an Unprotected Transparent Leased Dark Fiber Between 9301 Northwest 33rd Street, Doral, FL 33172 and 50 NE 9th Street, Miami, FL 33132.
Results
Doral, Miami, FL

63--Warning Siren
Post-Bid
Miami, FL 33125

Glades Park CCTV Security System and Network Equipment
Results
Doral, FL

Installation of Premise Wiring for Buildings
Post-Bid
Homestead, FL 330391299

Last Updated 12/12/2018 11:19 AM
Project Title

Fiber Optic Cable Upgrade

Physical Address View project details and contacts
City, State (County) Homestead, FL 330391299   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements. Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished.
Details
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Communications Backbone Cabling, Communications Optical Fiber Backbone Cabling, Communications Optical Fiber Splicing and Terminations, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents