Similar Projects
Roof Replacement at the Hancock VOR/DME facility in Kelsey
Renovation
Sub-Bidding
$100,000 CJ est. value
Hancock, NY 13783

Replace Roofs, Buildings 1 & 20 - GC
Renovation
Sub-Bidding
$7,000,000 CJ est. value
Saranac Lake, NY 12977

New Roof and Stucco Work at Fire Station 1
Alteration
Post-Bid
Wappinger, NY 12590

Replace Elevator and Roof 15H 21A
Renovation, Alteration - 19,000 SF
Post-Bid
$2,000,000 to $5,000,000 est. value
Wappingers Falls, NY 12590

Replace Roof at Kehoe Administration Building - SUNY Plattsburgh
Results
$250,000 to $500,000 est. value
Plattsburgh, NY 12901

Roofing Requirement at Fort Drum.
Results
$10,000,000 to $25,000,000 est. value
Fort Drum, NY

Jamestown Public Schools Capital Improvement Project Phase 1 - Fletcher Elementary, Technical Academy and Bus Garage - BP-03 Roofing
Renovation
Construction
$800,000 CJ est. value
Jamestown, NY 14701

HVAC Work Replace Roofs Building 1 & 20 Adirondack Correctional Facility
Renovation
Sub-Bidding
$250,000 CJ est. value
Saranac Lake, NY 12977

Fully Repair the Existing Roof
Alteration
Post-Bid
Essex, NY 12936

Trash Compactor, Roofing, and Floor Finish Upgrades
Alteration
Results
$90,000 to $210,000 est. value
Elmira, NY 14904

Reconstruction to Arlington High School - Roofing Work RC-3
Renovation
Sub-Bidding
$200,000 CJ est. value
Lagrangeville, NY 12540

Lee Road East Tank Rehabilitation and Concrete Roof Coating - Various
Infrastructure
Post-Bid
$2,000,000 to $3,000,000 est. value
NY

South Avenue Firehouse High Roof Replacement
Alteration
Results
$156,000 est. value
Rochester, NY 14620

Prevost Hall Roof Coating, Repairs and Coating/sealing of the Bell Tower
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Greenville, NY 12083

Building 9 Roof repair
Alteration
Post-Bid
Buffalo, NY 14224

Last Updated 06/08/2023 11:25 AM
Project Title

Broome DDSO-Farm to Market Roof Replacement

Physical Address View project details and contacts
City, State (County) Endicott, NY 13760   (Broome County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $42,583 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This is an RFQ (request for quotes). This is not an IFB (bid). The Broome DDSOO intends to award the contract to the most responsible and responsive vendor that provides the lowest cost and meets the requirements detailed in the scope of work. Upon request, vendor must demonstrate relevant experience on prior projects of similar magnitude. The Broome DDSO reserves the right to reject any and all quotes. In deciding whether to submit a quote, please be aware the awarded vendor must adhere to time frames outlined in the scope of work. The awarded vendor will also be required to submit certificates of Liability Insurance and Worker's Compensations Insurance as well as completed Lobbing Law Forms and Signed Appendix A. Please be prepared to submit these in a timely fashion. The Broome DDSO will make no concessions to the vendor for any alleged misunderstandings or deception because of quantity, quality, character, or other conditions. The Broome DDSO's interpretation of specifications shall be final and binging. Please note all staff working at the project site will be required to sign an attendance sheet for record purposes. This includes the residence visitors log and/or an attendance sheet provided by the maintenance department. Construction Vertical: Building Construction; Rehabilitation & New Construction - Construction SCOPE OF WORK includes, but is not necessarily limited to the following: 1. Remove the existing asphalt shingle roofing system complete down to the existing wood decking. Any damaged decking will be quoted and result in a change order. 2. Provide and install a new 30-year asphalt shingle roofing system complete, including all flashings, underlayment's, ice barriers, venting, accessories, and other roofing materials as required for a complete system. 3. Remove and replace exhaust vent covers as per existing, typical. Exhaust vents must be installed to go above the roof line per code requirements 4. Remove and replace drip edge at all eaves and gables, typical. 5. Flash all penetrations, typical. 6. Remove and replace ridge vents on all ridges, typical. Verify soffits are continuous vented along eave line everywhere. Venting is required for roof systems over conditioned spaces. 7. No asbestos-containing materials may be used Work must be completed within 60 days of receiving the purchase order.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents