Similar Projects
Holmes Road Improvements, Blue Ridge Boulevard to 137th Street - 89008543 - City of Kansas City
Infrastructure
Conception
$500,000 CJ est. value
Kansas City, MO 64131

Holmes Road Improvements, Blue Ridge Boulevard to 137th Street - 89008543 - City of Kansas City
Infrastructure
Conception
$500,000 CJ est. value
Kansas City, MO 64131

Uptown Lofts Part Two / Kansas City
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Kansas City, MO 64111

Uptown Lofts Part Two / Kansas City
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Kansas City, MO 64111

RFQ D/B - 63rd St. Reconst. (Sec 1) - Woodland Ave to Prospect Ave
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Kansas City, MO 64133

RFQ D/B - 63rd St. Reconst. (Sec 1) - Woodland Ave to Prospect Ave
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Kansas City, MO 64133

Indian Creek Trail Improvements
Infrastructure
Results
Kansas City, MO 64114

West 79th Street Sidewalks - Washington to Summit
Infrastructure
Results
MO 64114

AC Rialto Hotel
Renovation, Infrastructure - 169,000 SF
Construction
$65,700,000 CJ est. value
Kansas City, MO 64106

D/B-Design Build Services for a New Detention Center Facility
LEED Certification, New Construction, Infrastructure
Construction
$256,500,000 CJ est. value
Kansas City, MO 64133

Take 5 Oil Change / Blue Springs
New Construction, Infrastructure - 1,415 SF
Pending Verification
$350,000 CJ est. value
Blue Springs, MO 64015

Take 5 Oil Change / Blue Springs
New Construction, Infrastructure - 1,415 SF
Pending Verification
$350,000 CJ est. value
Blue Springs, MO 64015

Longview Tract by The Bay Water Park - City of Kansas City
Infrastructure
Conception
$315,000 CJ est. value
Kansas City, MO 64134

Pacific + Troost Residential
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Kansas City, MO 64106

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Last Updated 06/01/2023 11:21 AM
Project Title

Wornall Road Reconstruction - Gregory Boulevard to 75th Street - City of Kansas

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64114   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will be completed with a design-build project delivery contract and will reconstruct the pavement, curb, gutter, and sidewalks on Wornall Road from Gregory Boulevard to 75th Street. This will include the addition of sidewalks in areas that currently do not exist. A design-build reconstruction requires the entire funding to be provided to complete the project. These funds must be allocated to complete the improvements. The pavement for this portion of Wornall Road is in serious condition and needs to be replaced. Sidewalks will be included as per the Walkability Plan and pedestrian bus stop pads will also be constructed. The pavement will include recycled materials and additional trees will be planted. This street is included as a priority in the Country Club Waldo Area Plan. As of July 27 2021, this project is currently in the FY 2022-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents