Similar Projects
South Atlantic Regional Harbor Dredging
Results
$10,000,000 to $25,000,000 est. value
Brunswick, Savannah, GA - Morehead City, Wilmington, NC

South Atlantic Regional Harbor Dredging
Results
$10,000,000 to $25,000,000 est. value
Brunswick, Savannah, GA - Morehead City, Wilmington, NC

Naval Submarine Base Kings Bay, Maintenance Dredging 44, 45, And 47-Foot Project, Camden County, GA
Post-Bid
$10,000,000 to $25,000,000 est. value
GA

South Atlantic Division Regional Harbor Dredging Contract FY21
Results
$10,000,000 to $25,000,000 est. value
Brunswick, Savannah, GA - Morehead City, Wilmington, NC

South Atlantic Division Regional Harbor Dredging Contract FY21
Results
$10,000,000 to $25,000,000 est. value
Brunswick, Savannah, GA - Morehead City, Wilmington, NC

Dredging and Dewatering of Cornish Creek's Sludge Lagoons
Results
Covington, GA 30014

Digester Cleanout
Results
Less than $594,029 est. value
Tifton, GA 31793

Naval Submarine Base Kings Bay -- Entrance Channel, Maintenance Dredging - Cut-1N Through Range-E, 49, 45, And 44-Foot Project, Camden County, Georgia & Nassau County, Florida
Post-Bid
$15,000,000 to $25,000,000 est. value
Kings Bay, GA

Brunswick Inner Harbor Maintenance Dredging - Task Order
Post-Bid
$1,000,000 to $5,000,000 est. value
Brunswick, GA

Savannah Harbor DMCA 1N Dike Raising
Design
$1,000,000 to $5,000,000 est. value
Port Wentworth, Savannah, GA

Naval Submarine Base Kings Bay, Maintenance Dredging 44, 45, and 47-Foot Project
Results
$10,000,000 to $25,000,000 est. value
GA

Lagoon Dredging
Results
Peachtree City, GA 30269

Reported 07/22/2020 12:00 AM
Project Title

FY20 Savannah Inner Harbor Maintenance Dredging

Physical Address View project details and contacts
City, State (County) Savannah, GA 31401   (Chatham County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work may will include but not limited to the following: Contractor shall furnish all plant, labor, equipment, special equipment and material to fulfill the requirement of this Contract. Work has been traditionally performed with a hydraulic cutter-head dredge and the duration is expected to be one year from Notice to Proceed. Up to six million cubic yards of maintenance material is expected to be removed from the inner harbor. The work is located in the deep draft Savannah Harbor navigation project in Georgia. The Savannah Harbor project is located in Savannah, Georgia (GA) on the border of Georgia and South Carolina (SC) in Chatham County. The Savannah Inner Harbor channel is 42 ft. deep MLLW and 500 ft. wide to the upper end of Kings Island Turning Basin: 36 ft. deep MLLW and 400 ft. wide to the upper end of Argyle Island Turning Basin; and 30 ft. deep MLLW and 200 ft. wide to the upper limit of the project. Savannah Harbor’s Kings Island Turning Basin (KITB) is the primary turning basin for large civilian and military ships, lying adjacent to the Georgia Ports Authority docks. KITB requires dredging twice a year to allow the loaded ships to freely turn when using the port. Approximately 1.6 million cubic yards of maintenance material is removed from the KITB annually.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents