Last Updated 04/15/2021 02:25 PM
Project Title

2020 Water Main Replacement Multiple Locations

Physical Address View project details and contacts
City, State (County) Grosse Ile, MI 48138   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Section I – Upper Meridian Road – Voigt Ave. to Paulina Ave.: Remove approx. 975 square yards of existing pavement; Flowable fill approx. 2,000 feet of existing water main; Remove (3) existing Gate Valve and Well; Remove (4) existing Fire Hydrants; Construct approx. 100 square yards of 6 inch non-reinforced concrete pavement, MDOT Grade P1, on new 6 inch MDOT 21AA Crushed Limestone Base; Construct approx. 150 square yards of 3 inch HMA pavement (Driveways), on new 6 inch MDOT 21AA Crushed Limestone Base; Construct approx. 800 square yards of 1 ½” HMA top (F), County mix on new 9 inch MDOT Crushed Limestone Base; Construct approx. 800 square yards of 4 ½ ” HMA Base in 2 equal lifts, County mix; Install approx. 450 feet of DI CL54 Water main via excavation method; size varies 6 inch to 12 inch in dia.; Install approx. 1,275 feet of 12 inch Fusible PVC C900, D18 via directional drilling method; Install approx. 50 feet of 8 inch Fusible PVC C900, D18 via pipe bursting method; Install (3) 12 inch valve in 6 ft dia. Well; Install (5) 2- Storz connections Fire Hydrants & Hydrant Assemblies; Sanitary Sewer Lead to be televised prior and after water main installation; Reconnect approx. (24) water services; Paint approx. 3,250 feet of 4 inch Wide White Solid Color; Paint approx. 300 feet of 4 inch Wide Yellow Solid Color; Paint approx. 1,500 feet of 4 inch Wide Yellow Skip Color; All related work; Section II – Church Road – W. River Rd. to Meridian Rd.: Clearing and Grubbing, Tree Removal; Remove approx. 400 square yards of existing pavement; Remove approx. 175 feet of existing storm pipe; Flowable fill approx. 200 feet of existing water main; Remove (4) existing Gate Valve and Well; Remove (4) existing Fire Hydrants; Construct approx. 150 square yards of 6 inch non-reinforced concrete pavement, MDOT Grade P1, on new 6 inch MDOT 21AA Crushed Limestone Base; Construct approx. 225 square yards of 3 inch HMA pavement (Driveways/Bike Path), on new 6 inch MDOT 21AA Crushed Limestone Base; Construct approx. 275 square yards of 1 ½” HMA top (F), County mix on new 9 inch MDOT Crushed Limestone Base; Construct approx. 275 square yards of 4 ½ ” HMA Base in 2 equal lifts, County mix; 00100-2 Install approx. 425 feet of DI CL54 Water main via excavation method; size varies 6 inch to 8 inch in dia.; Install approx. 2,300 feet of 8 inch Fusible PVC C900, D18 via pipe bursting method; Install (1) 16x16x8 inch tapping sleeve in 6 ft dia. Well; Install (3) 8 inch valve in 5 ft dia. Well; Install (7) 2- Storz connections Fire Hydrants & Hydrant Assemblies; Sanitary Sewer Lead to be televised prior and after water main installation; Reconnect approx. (29) water services; Install approx. 50 feet of 12 inch CMP Pipe; Install approx. 125 feet of RCP CLIV, C76 storm pipes; 12 inch dia.; Regrade approx. 275 feet of 2 ft wide Ditch; All related work; Section III – Meridian Road – Grosse Ile Parkway to Island Dr.: Clearing and Grubbing, Tree Removal; Remove approx.1,400 square yards of existing pavement; Flowable fill approx. 8,525 feet of existing water main; size varies 8 inch and 16 inch in dia.; Remove (22) existing Gate Valve and Well; Remove (5) existing Fire Hydrants; If necessary, install a line stop on the exist. 16 inch water main; Construct approx. 25 square yards of 6 inch non-reinforced concrete pavement, MDOT Grade P1, on new 6 inch MDOT 21AA Crushed Limestone Base; Construct approx. 475 square yards of 3 inch HMA pavement (Driveways/Bike Path), on new 6 inch MDOT 21AA Crushed Limestone Base; Construct approx. 750 square yards of 2” HMA top (F), County mix on new 9 inch MDOT Crushed Limestone Base; Construct approx. 900 square yards of 10 inch non-reinforced concrete pavement, MDOT Grade P1, on new 9 inch MDOT 21AA Crushed Limestone Base; Install approx. 350 feet of DI CL54 Water main via excavation method; size varies 6 inch to 12 inch in dia.; Install approx. 300 feet of DI CL54 Water main inside casing, 16 inch; Install approx. 400 feet of 8 inch Fusible PVC C900, D18 via directional drilling method; Install approx. 5,325 feet of 16 inch Fusible PVC C900, D18 via pipe bursting method; Install approx. 800 feet of 16 inch Fusible PVC C900, D18 via directional drilling method; Jack & Bore under the Canal using 24 inch steel casing, 13/32 inch thick, 300 lineal feet long; Install (9) 8 inch valve in 5 ft dia. Well; Install (1) 12 inch valve in 6 ft dia. Well; Install (11) 16 inch valve in 6 ft dia. Well; Install (12) 2- Storz connections Fire Hydrants & Hydrant Assemblies; Reconnect approx. (29) water services;

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents