Similar Projects
Acid Wash Swimming Pool
Results

Del Rio Lofts Apartments
New Construction - 132,394 SF
Post-Bid
$6,500,000 est. value
Del Rio, TX 78840

San Felipe Pastures Water Line Improvements
Infrastructure
Results
$363,083 CJ est. value
Del Rio, TX 78840

Pool Climbing Wall
Term Contract
Post-Bid
Laughlin AFB, TX

US 90 - Planing, Overlaying, Rail Upgrade and Pavement Markings
Infrastructure
Results
$12,109,239 est. value
Comstock, TX 78851

Rio Manor Apartments
New Construction
Pending Verification
Del Rio, TX 78840

Repair Overruns on Center Runway
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Laughlin AFB, TX 78843

Alcoa Fields Black Screened Dirt, Sandy Loam And Grade Work For The Alcoa Fields At Frontera Road
Infrastructure
Design
$2,000,000 CJ est. value
Del Rio, TX 78840

Site Development and Visitor Check-In
Infrastructure, Renovation
Post-Bid
$6,200,000 CJ est. value
Del Rio, TX 78840

Dodson Storage - Building A
New Construction, Infrastructure - 16,200 SF
Pending Verification
$3,250,000 CJ est. value
Del Rio, TX 78840

Family Dollar Tree - US Highway 90 / Del Rio
New Construction, Infrastructure - 10,531 SF
Design
$1,000,000 CJ est. value
Del Rio, TX 78840

Kingsway & Cantu - City of Del Rio
Infrastructure
Conception
$698,600 CJ est. value
Del Rio, TX 78840

Dove Avenue - City of Del Rio
Infrastructure
Conception
$517,200 CJ est. value
Del Rio, TX 78840

Rockwood Street - City of Del Rio
Infrastructure
Conception
$393,100 CJ est. value
Del Rio, TX 78840

Dredging Services at the Wastewater Treatment Plants
Infrastructure
Bidding
$5,000,000 CJ est. value
Del Rio, TX 78840

Last Updated 10/11/2022 10:08 AM
Project Title

Rio Manor Apartments

Physical Address View project details and contacts
City, State (County) Del Rio, TX 78840   (Val Verde County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Pavilion Construction is soliciting bids from subcontractors and vendors to perform all trades for this project. Rio Manor Apartments consists of (4) two-story apartment buildings (two type I, two type II) totaling 60 units, as well as a clubhouse building, maintenance building, pool equipment building with pool arbor, (2) trash enclosures and community pool. The project site is 4.089 total acres and has 108 on-grade parking stalls and a metal picket fence that encloses the site with (3) motorized gate openings for vehicle access. Anticipated Project Start Date 1/1/23 Anticipated Project Completion Date 3/31/24 All bidders must be in good standing with Pavilion Construction. If not previously submitted, bidders shall complete and submit with proposal. All bids shall provide material, labor, and equipment that conform to the project construction documents and material specifications.

Details

4 Stories Above Grade, Acre, 4089 Acre.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents