Similar Projects
Bridge Superstructure Replacement and Rehabilitation Bundling Design-Build Project
Bidding
Richmond, VA

Kirby Road Walkway from Chesterbrook Elementary School to Halsey Road and Halsey Road to Franklin Avenue
Bidding
McLean, VA 22101

Sidewalk Trip Hazard Removal
Term Contract
Post-Bid
Buchanan, VA 24066

Driveway, Slope and Grade Repair-Culpeper
Post-Bid
Culpeper, VA 22701

State HQ Modernization Parking Lot Extension
Results
Richmond, VA 23297

Chandon Park Trail Improvements
Results
Herndon, VA 20172

Courthouse Road Trail (Salem Church Road to Courts Complex Road)
Bidding
$500,000 to $749,999 est. value
VA

Parking Area Upgrades
Post-Bid
Tasley, VA

Botanical Gardens Cobblestone Bridge Replacement
Results
Less than $1,496,825 est. value
Norfolk, VA 23510

Bridge Scour Protection
New Construction
Bidding
$1,835,000 est. value

Z--Sidewalk Replacement
Post-Bid
$100,000 to $250,000 est. value
Hampton, VA 23667

Green Circle - Phase III
Results
Winchester, VA 22601

SGR - Bridge Replacement Over NSRR
New Construction
Bidding
$2,555,000 est. value
VA

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Newport News, Roanoke, Wytheville, VA

SRG- Bridge Replacement over Bell Creek
Results
Less than $3,887,000 est. value
VA

Last Updated 04/29/2021 03:45 PM
Project Title

Staunton River Battlefield State Park Bridge Renovation and ADA Parking

Physical Address View project details and contacts
City, State (County) Randolph, VA 23962   (Charlotte County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction improvements and selective demolition of the existing pedestrian walkway trail at the park. Improvements will include replacement of deck boards, handrails, handrail framing and fencing, trail abutment repairs, wooden stair replacement, and the addition of one (1) ADA parking spot adjacent to the trail head.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 06 - Wood, Plastics, and Composites.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents