Similar Projects
Sugar Creek Charter School Expansion
New Construction
Conception
Charlotte, NC 28213

EE Smith High School Replacement
New Construction
Conception
$85,000,000 est. value
Fayetteville, NC

M15 Fuquay-Varina Middle School
Renovation
Design
Fuquay-Varina, NC

H12 New High School
New Construction
Design
Less than $152,291,274 est. value
Apex, NC 27539

E. E. Waddell High School Renovation
Renovation
Bidding
Charlotte, NC

Additions and Renovations to East Carteret High School
Renovation, Addition
Bidding
Beaufort, NC 28516

New Middle School
New Construction
Post-Bid
$30,000,000 est. value
Jefferson, NC

Security Upgrades to the Turrentine Middle School
Renovation
Post-Bid
Burlington, NC 27215

Additions to Swain County High School
Addition
Results
NC

Construction of Innovation Academy
New Construction
Results
Smithfield, NC 27577

New Northern High School Replacement
New Construction - 278,613 SF
Construction
$51,250,000 est. value
Durham, NC 27704

Thales Academy at Chatham Park
New Construction - 54,284 SF
Construction
$4,092,533 est. value
Pittsboro, NC 27312

Rosman Middle School
Renovation, Addition
Pending Verification
Rosman, NC 28772

Shining Rock Classical Academy - Phase II
Addition
Pending Verification
Waynesville, NC 28786

Richmond Senior High School Project
Renovation
Conception
Rockingham, NC 28379

Reported 12/10/2021 10:47 AM
Project Title

Construction Manager At Risk (CM and R) Qualification - Renovations to North Forsyth High School

Physical Address View project details and contacts
City, State (County) Winston-Salem, NC 27105   (Forsyth County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced July 2021
Bids Due View project details and contacts
Estimated Value $17,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This will be a multi-phased renovation of the 1963 Building. Scope includes site/site utility upgrades, renovation of the existing main office/admin area, media center, classrooms, restrooms, kitchen, cafeteria, front entrance, & multiple courtyards. A new front entrance to the building will be established & a small dining room expansion will be included in the scope of the project. BP099 FINAL CLEANING, BP220 SITEWORK, BP235 SELECTIVE DEMOLITION/ASBESTOS ABATEMENT, BP290 LANDSCAPING/HARDSCAPE, BP299 CHAIN LINK FENCE/DECORATIVE STEEL PICKET FENCE, BP390 CIP CONCRETE (TURNKEY), BP400 MASONRY (TURNKEY), BP500 STRUCTURAL AND MISC. METALS (TURNKEY), BP640 MILLWORK & COUNTERTOPS, BP740 ROOFING & METAL PANELS, BP800 DOORS, FRAMES, HARDWARE (TURNKEY), BP810 SPECIALTY DOORS, BP840 GLASS & GLAZING, BP920 METAL FRAMING, DRYWALL & INSULATION, BP925 CEILING TREATMENTS, BP960 FLOORING (SOFT), BP961 HARD TILE, BP990 INTERIOR & EXTERIOR PAINTING & COATINGS, BP1000 MISC ACCESSORIES (TURNKEY), BP1014 SIGNAGE & GRAPHICS, BP1022 FOLDING GLASS PANEL PARTITIONS, BP1100 FOOD SERVICE EQUIPMENT, BP1240 WINDOW TREATMENTS, BP1540 PLUMBING SYSTEMS, BP1550 MECHANICAL SYSTEMS, BP1600 ELECTRICAL SYSTEMS & SITE LIGHTING

Details

Middle/Senior High School, 98,601 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents