Similar Projects
Civic Center Glen Ave Loading Zone/Road Improvements - Wicomico County
Infrastructure
Conception
$500,000 est. value
Salisbury, MD 21804

Civic Center Glen Ave Loading Zone/Road Improvements - Wicomico County
Infrastructure
Conception
$500,000 est. value
Salisbury, MD 21804

ModWash Car Wash / Fruitland
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Salisbury, MD 21801

ModWash Car Wash / Fruitland
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Salisbury, MD 21801

SBY Runway and Taxiway Crack Repairs
Infrastructure
Bidding
$50,000 CJ est. value
Salisbury, MD 21804

SBY Runway and Taxiway Crack Repairs
Infrastructure
Bidding
$50,000 CJ est. value
Salisbury, MD 21804

Surface Abrasion and Diamond Grinding of Roadways at Various Locations Statewide
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value

Asphalt Overlay Calendar Year 2022
Term Contract, Infrastructure
Post-Bid
$2,500,000 est. value

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Roadway Improvements
Infrastructure
Results
Pittsville, MD 21850

Marina Landing
New Construction, Infrastructure - 25,646 SF
Pending Verification
$28,900,000 CJ est. value
Salisbury, MD 21801

Marina Landing
New Construction, Infrastructure - 25,646 SF
Pending Verification
$28,900,000 CJ est. value
Salisbury, MD 21801

Salisbury Middle School Site - Paving / Parking Lots - 49.03.393 - Wicomico County Public Schools
Infrastructure
Conception
$888,000 est. value
Salisbury, MD 21801

Landfill Cell 7 Construction - County of Wicomico
Infrastructure
Design
$6,400,000 est. value
Salisbury, MD 21801

Helical Pier Underpinning at Wastewater Treatment Plant
Infrastructure
Bidding
$3,000,000 CJ est. value
Salisbury, MD 21801

Last Updated 04/10/2023 11:04 AM
Project Title

Jasmine Drive Apartments

Physical Address View project details and contacts
City, State (County) Salisbury, MD 21804   (Wicomico County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $89,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of 11 apartment buildings and a clubhouse with a swimming pool. As of April 10, 2023, this project is on hold. A timeline for construction has not been disclosed.

Details

3 Stories Above Grade, 327,216 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents