Similar Projects
Well #10 Pump Replacement and Installation
Renovation, Infrastructure
Bidding
$25,000 CJ est. value
Branson, MO 65616

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Bee Creek Road Bridge Replacement
New Construction
Results
Branson, MO 65616

Bridge Repairs
New Construction, Infrastructure
Results
$1,000,000 to $2,500,000 est. value

The Ridge at Table Rock Lake
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Branson, MO 65615

The Ridge at Table Rock Lake
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Branson, MO 65615

Fire Station #4 Construction
New Construction, Infrastructure
Post-Bid
$5,975,000 CJ est. value
Branson, MO 65616

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

Donnelly Ridge
New Construction, Infrastructure
Pending Verification
$18,105,600 CJ est. value
Branson, MO 65616

Compton Wastewater Treatment Plant Flood Protection Wall - City of Branson
Infrastructure
Post-Bid
$2,599,000 CJ est. value
Branson, MO 65616

Bridge Replacement Over Long Creek Branch of Table Rock Lake
New Construction, Infrastructure
Results
$25,000,000 to $50,000,000 est. value
MO

Woodland II Apartments
New Construction, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Forsyth, MO 65653

Water Meter Replacements
Infrastructure
Results
$500,000 CJ est. value
Branson, MO 65616

Table Rock State Park RTP Trail Paving Project
Infrastructure
Post-Bid
$700,000 CJ est. value
Branson, MO 65616

Last Updated 05/12/2023 11:31 AM
Project Title

2 Bridge Rehibilitation - Route 76

Physical Address View project details and contacts
City, State (County) Forsyth, MO 65653   (Taney County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J7P3548 Route 76 TANEY County. 2 Bridge rehabilitation over Roark Creek and Missouri and Northern Arkansas Railroad near Branson, the total length of improvement being 0.95 miles. Range: Range: $1M to $2.5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of Missouri, acting by and Through the Missouri highways and transportation commission", as Obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. All Questions Concerning the Project Should Be Directed to the Project Contact Listed in the Job Special Provisions of the Request for Bid. All Questions Concerning Bid Document Preparation Can Be Directed to the Central Office - Design Division at (573) 751-2876. MO DOT - G03 - 2 Bridge Rehibilitation - Route 76 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents