Similar Projects
Additions and Renovations to Mulberry Community Food Pantry - Bid Package for Cooler, Freezer Addition
Addition, Demolition, Renovation, Infrastructure - 2,385 SF
Sub-Bidding
$300,000 CJ est. value
Mulberry, AR 72947

HVAC Systems - Kingston Campus
Renovation
Sub-Bidding
$400,000 CJ est. value
Kingston, AR 72742

HVAC units Districtwide
Post-Bid
Donaldson, AR 71941

HVAC Maintenance - ASC
Term Contract
Post-Bid
Hot Springs, AR

W041--Chiller Rental
Term Contract
Results

W041--Chiller Rental
Term Contract
Results

HVAC Renovations of the Performing Arts Center
Alteration
Post-Bid
West Memphis, AR 72301

HVAC Improvements at Daffin Manor
Alteration
Results
Batesville, AR

Gym HVAC Renovation
Alteration
Post-Bid
$29,500 est. value
Guy, AR

Millwood Project Office - Replace HVAC
Alteration
Results
Ashdown, AR

HVAC and Ionization Upgrade in Cafeteria and Classrooms
Alteration
Post-Bid
Mountain Pine, AR

Bldg. 5C Upgrade Ventilation & Cooling in Data Center
Term Contract
Results
$500,000 to $1,000,000 est. value
Jefferson, AR

Replacing 4 Package Units at Conway Junior High School
Alteration
Post-Bid
Conway, AR

HVAC Unit Replacement
Term Contract
Results
$25,000 to $100,000 est. value
Booneville, Mount Ida, Oden, AR 71957

Replace the HVAC Systems for the Cleveland County Courthouse, Sheriff`s Office, Jail, and Senior Citizen's Center
Alteration
Post-Bid
Rison, AR 71665

Last Updated 11/30/2022 06:03 PM
Project Title

High School HVAC Replacement

Physical Address View project details and contacts
City, State (County) Rison, AR 71665   (Cleveland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the work shall include the general listings as shown below in addition to which this contractor shall furnish and install all required pipe, fittings, valves, hangers, supports, sleeves, insets, traps, and other such equipment, items, and appurtenances as may be required for a complete and operative system or systems, including all parts auxiliary to the system or systems whether or not specifically set forth herein and/or shown on the Drawings. No partial sets will be issued. Bid proposals must be accompanied by a bidder's bond or cashiers check in the amount of five percent (5%) of the bid, made payable to the Cleveland County School District, Rison, Arkansas. The successful bidder will be required to furnish satisfactory performance and payment bond using AIA Document A312. The Owner reserves the right to waive any informality, or to reject any or all bids. No bid shall be withdrawn for a period of thirty (30) days subsequent to the opening of the bids, without written consent of the Owner.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents