Project Title | Resurfacing and Related Work (Including 9 Bridge Decks and Cable Guardrail Installation) on A Section of Interstate 95 |
Physical Address | View project details and contacts |
City, State (County) | Boxford, Danvers, Rowley, Topsfield, MA 01921 (Essex County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $22,193,982 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | "1.000","Ls","Schedule Of Operations - Fixed Price $107,500","100." "1.000","a","Clearing And Grubbing","101." "4500.000","Ft","Tree Trimming","102.1" "15.000","Hr","Control Of Invasive Plants Existing On Site","102.3" "10.000","Hr","Invasive Plant Management Strategy","102.33" "1825.000","Cy","Earth Excavation","120." "5225.000","Cy","Unclassified Excavation","120.1" "800.000","Cy","Concrete Excavation","127." "540.000","Cy","Reinforced Concrete Excavation","127.1" "130.000","Cy","Test Pit For Exploration","141.1" "1100.000","Cy","Gravel Borrow","151." "30.000","Cy","Sand Borrow","154." "390.000","Ton","Crushed Stone","156." "5000.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ft","Ground Water Observation Wellpoint Type Ii","192.1" "800.000","Ea","Drainage Structure Adjusted","220." "600.000","Ft","Drainage Structure Rebuilt","220.2" "50.000","Ea","Frame And Cover - Secured","221.1" "815.000","Ea","Frame And Grate - Massdot Bar Type","222." "80.000","Ea","Frame And Grate - Massdot Cascade Type","222.1" "1000.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "830.000","Cy","Removal Of Drainage Structure Sediment","227.3" "4000.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "5.000","Sf","Masonry Plug","227.4" "45.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "25.000","Ft","15 Inch Reinforced Concrete Pipe","241.15" "2.000","Ea","12 Inch Reinforced Concrete Pipe Flared End","242.12" "10.000","Sy","Stone For Pipe Ends","258." "221930.000","Sy","Pavement Fine Milling","415.2" "13590.000","Sy","Bridge Pavement Milling","415.4" "176000.000","Sy","Pavement Micromilling For Inlay","415.5" "765810.000","Sy","Ultra Thin Bonded Overlay-Polymer Modified (Hma-Utbo-Pm)","450.16" "18140.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - p)","450.231" "2020.000","Ton","Hma For Patching","451." "13000.000","Gal","Asphalt Emulsion For Tack Coat","452." "3540.000","Ton","Superpave Waterproofing Surface Course (Ssc-w-12.5)","457.2" "450.000","Ton","Temporary Asphalt Patching","472." "14500.000","Gal","Hot Applied Asphaltic Crack Filler (Cmcr)","482.03" "1225.000","Ft","Sawing & Sealing Joints In Asphalt Pavement At Bridges","482.31" "3460.000","Ea","Slotted Pavement Marker Removal","490.51" "17550.000","Gal","Fog Seal For Shoulders - Polymer","492.103" "150.000","Ft","Granite Curb Type Va4 - Straight","504." "50.000","Ft","Granite Curb Type Va4 - Curved","504.1" "40.000","Ea","Granite Curb Type Va4 - Splayed End","504.2" "200.000","Ft","Granite Transition Curb For Wheelchair Ramps - Straight","509." "240.000","Ft","Granite Transition Curb For Wheelchair Ramps - Curved","509.1" "4960.000","Ft","Granite Edging Type Sc","513." "6.000","Ea","Granite Curb Inlet - Straight","514." "120.000","Ton","Hot Mix Asphalt Curb Type 1","572.1" "150.000","Ft","Curb Removed And Reset","580." "6.000","Ea","Curb Inlet Removed And Reset","581." "5010.000","Ft","Edging Removed And Reset","583." "280.000","Ft","Curb Removed And Discarded","594." "6.000","Ea","Curb Inlet Removed And Discarded","595." "4800.000","Ft","Edging Removed And Discarded","597." "83550.000","Ft","High Tension Cable System","620.016" "675.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "10975.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "175.000","Ft","Guardrail, Tl-2 (Double Faced)","621.12" "40.000","Ea","High Tension Cable System End Treatment","627.016" "105.000","Ea","Trailing Anchorage","627.1" "2.000","Ea","Guardrail End Treatment, Tl-2 (Double Faced)","627.72" "10.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "110.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "175.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "2.000","Ea","Impact Attenuator For Median, Incapable Of Redirection","628.33" "3520.000","Ft","Highway Guard Removed And Reset","630." "8825.000","Ft","Highway Guard Removed And Discarded","630.2" "895.000","Ea","Silt Sack","697.1" "310.000","Sy","Geotextile Fabric For Stabilization","698.1" "430.000","Sy","Geotextile Fabric For Subsurface Drainage","698.2" "360.000","Sy","Cement Concrete Wheelchair Ramp","701.2" "120.000","Ton","Hot Mix Asphalt Walk Surface","702." "45.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "3.000","Ea","Emergency Response","748.1" "3180.000","Cy","Loam Borrow","751." "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "29050.000","Sy","Seeding","765." "37480.000","Ft","Sediment Control Barrier","767.121" "97400.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "4900.000","Ft","Wire Loop Installed In Roadway","819.831" "8.000","Ea","Install 4 Lane Volume Traffic Data Collection Stations","819.904" "6.000","Ea","Install 4 Lane Classification Traffic Data Collection System","819.908" "210.000","Ea","Delineation For Guard Rail Termini","833.7" "10.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "10.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/2 Brkway Post Assemblies-Steel","848.1" "1080.000","Day","Traffic Cones For Traffic Management","851.1" "2420.000","Sf","Safety Signing For Traffic Management","852." "220.000","Ft","Temporary Pedestrian Barricade","852.11" "65.000","Ea","Temporary Pedestrian Curb Ramp","852.12" "6.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "1630.000","Day","Truck Mounted Attenuator","853.403" "1080.000","Day","Temporary Illumination For Work Zone","853.8" "473300.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "61170.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "8690.000","Day","Temporary Portable Rumble Strip","854.6" "1190.000","Day","Arrow Board","856." "2220.000","Day","Portable Changeable Message Sign","856.12" "108000.000","Day","Reflectorized Drum","859." "2370.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "890.000","Ea","Pavement Markings For Drainage Feature Locations","864.001" "1350.000","Sf","Pavement Arrows And Legends Reflectorized White (Thermoplastic)","864.04" "800.000","Ea","Slotted Pavement Marker One-Way Red","864.30" "330.000","Ea","Slotted Pavement Marker One-Way White","864.31" "930.000","Ea","Slotted Pavement Marker Two-Way Yellow/Red","864.34" "284650.000","Ft","6 Inch Wet Reflective Recessed White Line (Thermoplastic)","868.106" "17070.000","Ft","12 Inch Wet Reflective Recessed White Line (Thermoplastic)","868.112" "9520.000","Ft","4 Inch Wet Reflective Recessed White Line (Preformed)","868.304" "196750.000","Ft","6 Inch Wet Reflective Recessed Yellow Line (Thermoplastic)","869.106" "650.000","Ft","12 Inch Wet Reflective Recessed Yellow Line (Thermoplastic)","869.112" "40.000","Ea","Traffic Sign Removed And Reset","874.2" "540.000","Cy","Rapid Setting Concrete (Low Absorption)","904.14" "18900.000","Lb","Steel Reinforcement For Structures","910." "375.000","Ft","Modified Asphaltic Bridge Joint System","971.12" "1025.000","Ft","Pre-Compressed Seal Bridge Joint System","973." |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |