Similar Projects
Silicone Joint Sealer
Infrastructure
Bidding

Main Street Hashtag Connector Phase I
Infrastructure
Bidding
Pensacola, FL 32598

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Design-Bid-Build Paving Indefinite Delivery Indefinite Quantity Single Award Construction Contract for the Naval Air Station Pensacola Florida Area of Responsibility
Results
$15,000 to $1,000,000 est. value
Pensacola, FL 32508

CR 95A and Old Chemstrand Road Intersection Improvements
Results
Pensacola, FL 32502

Resurfacing/Concrete Pavement/Base Work/Drainage Improvements
Infrastructure
Bidding
$6,274,463 est. value
FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Pensacola Beach Access Road Improvements
Results
FL

Asphalt Maintenance-Districtwide Maintenance
Infrastructure
Bidding
$500,000 est. value

Cathodic Protection Repairs Project
Infrastructure
Post-Bid
Pensacola, FL

Asphalt Plant Mix and Tack Coat
Results
FL

12th Avenue at Fairfield Drive Drainage Improvements
Infrastructure
Bidding
West Pensacola, FL 32505

Lake Charlene Drainage Improvements
Infrastructure
Post-Bid
$2,101,252 est. value
Myrtle Grove, FL 32506

General Paving and Drainage
Results
FL

Last Updated 03/25/2022 09:02 AM
Project Title

Pine Valley Estates Phase I and II

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32526   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is divided into two phases. Phase I - Fridinger Drive - Roadway and Drainage Improvements The project will improve the roadway and drainage to reduce the flooding occurring on approximately 1,200 LF of Fridinger Lane, beginning at the existing concrete outfall on 8 Mile Creek and proceeding in a north direction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents