Similar Projects
Grand Ridge over Bills Run - Grundy County
Infrastructure
Conception
$600,000 CJ est. value
Grand Ridge, IL 61325

Grand Ridge over Bills Run - Grundy County
Infrastructure
Conception
$600,000 CJ est. value
Grand Ridge, IL 61325

Illinois River Basin, Starved Rock Pool, Lasalle County, IL, Starved Rock Breakwater
Infrastructure
Bidding
$10,000,000 CJ est. value
Utica, IL 61373

2023 Park Improvement
Infrastructure
Bidding
$480,000 CJ est. value
Tonica, IL 61370

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Non-MFT Street Program
Infrastructure
Results
Mendota, IL

Water Street Reconstruction
Infrastructure
Results
$1,382,712 est. value
Peru, IL 61354

Etna Road Mixed-Use Building
Renovation, Infrastructure
Conception
$5,000,000 CJ est. value
Ottawa, IL 61350

Sanitary Sewer Extension East of Perra Drive
Infrastructure
Bidding
$100,000 CJ est. value
Peru, IL 61354

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

2022 RBI/MFT Street Program
Infrastructure
Results
Peru, IL

Agg. Surf. Cse
Infrastructure, Term Contract
Bidding
$500,000 CJ est. value
Ottawa, IL 61350

Rowe Street and Various
Infrastructure
Post-Bid
$8,351,000 est. value
Sheridan, IL

2022 Cape Seal
Infrastructure
Results
Ottawa, IL

Last Updated 08/11/2023 11:33 PM
Project Title

Milling and Resurfacing With a Designed Overlay of IL 18

Physical Address View project details and contacts
City, State (County) Streator, IL 61364   (La Salle County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $4,236,173 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Milling and resurfacing with a designed overlay of IL 18 including storm_sewer construction, drainage and ADA ramp improvements. From the intersection of IL 17 and IL 18 in south eastern Streator and ends at the intersection of Otter Creek Road and IL 18 in Streator. Region 2 District 3 Federal Project # COVD98JQ(447) County(s) Livingston LaSalle Key Route(s) FAP 653 Marked Route(s) IL 18 Section(s) (28,29)RS-3 State Job #(s) C-93-061-11 PPS #(s) 3-01850-0080 45 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 024 - Milling and Resurfacing With a Designed Overlay of IL 18 This project begins near the intersection of IL 17 / IL 18 and heads north along IL 18 for 7.94 miles through Livingston and LaSalle counties ending at the intersection of IL 18 and Otter Creek Road.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents