Similar Projects
Smyrna Parkway Area Water Main
Infrastructure
Bidding
$500,001 to $1,000,000 est. value
Louisville, KY

Garrs Lane Area Water Main Replacement
Infrastructure
Bidding
$1,000,001 to $3,000,000 est. value
Louisville, KY 40211

Chiller and Water Replacement at Westport Middle School
Post-Bid
Louisville, KY 40222

Chiller and Water Replacement at Rutherford Elementary School
Post-Bid
Louisville, KY 40214

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Tapping Saddles for PVC and Ductile Iron Pipe
Results
Louisville, KY 40202

Charleswood Road Area Water Main Replacement
Post-Bid
$1,000,001 to $3,000,000 est. value
Louisville, KY 40229

Gridtie-Farm Spring Drive to Wolf Pen Lane Water Main
Results
$50,001 to $100,000 est. value
Louisville, KY 40202

Hinchbrook Boulevard Area Water Main Replacement
Post-Bid
$1,000,000 to $3,000,000 est. value
Louisville, KY 40272

Newburg Road Water Main Replacement
Results
Louisville, KY 40202

Grand Avenue Area Water Main Replacement
Post-Bid
$1,000,001 to $3,000,000 est. value
Louisville, KY 40219

Cane Run Road
Results
$50,001 to $100,000 est. value
Louisville, KY 40202

Taylorsville Road Area MRRP
Post-Bid
$1,000,001 to $3,000,000 est. value
Louisville, KY 40219

Stone Street Road Area Water Main Replacement
Results
$250,001 to $500,000 est. value
Louisville, KY 40272

Audubon Parkway Area Water Main Replacement
Post-Bid
$1,000,001 to $3,000,000 est. value
Louisville, KY 40213

Last Updated 05/14/2021 03:45 PM
Project Title

Clifton Heights CSO Basin Sump Water Line

Physical Address View project details and contacts
City, State (County) Louisville, KY 40206   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $30,000 to $75,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of approximately 150 feet of wall-mounted 2-inch S.S. water line from the valve vault to the basin wet well sump pumps, actuated control ball valve, electrical and control wires, and appurtenances. MSD Clifton Heights CSO Basin, 1827 Drescher Bridge Avenue, Louisville, KY. All work shall be done in accordance to MSD's Standard Specifications.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents