Similar Projects
Idea Public Schools Edgemere Portable Classroom Relocation
Renovation
Design
$600,000 est. value
El Paso, TX 79938

Da Vinci School Gymnasium
New Construction - 26,422 SF
Bidding
$5,000,000 est. value
El Paso, TX 79912

Construction of the Montwood High School Campus Improvement
New Construction
Post-Bid
El Paso, TX

District Wide Portable Buildings Relocation
Post-Bid
El Paso, TX 79925

Districtwide Elevator Rehabilitation Project
Results
El Paso, TX

Canutillo Independent School District Cafeteria Upgrades No. 2
New Construction
Results
Canutillo, TX 79835

Hanks Middle School - Package 1 (Demo)
Construction
El Paso, TX 79936

Hanks Middle School - Package 2 (General Construction)
New Construction
Post-Bid
El Paso, TX 79936

Job Order Contracting and Facilities Construction Services State of New Mexico
New Construction
Results
El Paso, TX

New Combo School - Eastlake
New Construction
Post-Bid
El Paso, TX 79928

Job Order Contracting and Facilities Construction Services - State of Texas
New Construction
Results
El Paso, TX

Bel Air High School Campus Improvements
Post-Bid
El Paso, TX 79915

New Student Activity Complex
New Construction
Results
El Paso, TX

Harmony School of Endeavor
New Construction - 97,000 SF
Post-Bid
$15,000,000 est. value
El Paso, TX 79924

Single Step Process for BP1910 Rio Bravo MS, Parkland HS and Ysleta HS Upgrades and Renovations
Renovation
Results
$22,000,000 est. value
El Paso, TX 79907

Reported 06/29/2022 10:56 AM
Project Title

Interior Alterations to Ysleta Middle School

Physical Address View project details and contacts
City, State (County) El Paso, TX 79907   (El Paso County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Working plans call for the renovation of a 11,550-square-foot, one-story above grade educational facility. Interior Alterations within an existing school building. As of June 28, 2022, a building permit was applied for and is pending review. An architect has been selected; however, a general contractor or selection method is not disclosed. Although a firm timeline cannot currently be established, construction is not expected to commence prior to third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Middle/Senior High School, 1 Story Above Grade, 11,550 SF Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents