Similar Projects
Full Service Elevator Maintenance
Term Contract
Design
Mesa, Phoenix, Scottsdale, Tucson, AZ - Kenner, LA - Greenwood, MS - Albuquerque, NM 85034

Full Service Elevator Maintenance
Term Contract
Design
Mesa, Phoenix, Scottsdale, Tucson, AZ - Kenner, LA - Greenwood, MS - Albuquerque, NM 85034

Pre - Engineered Steel Covered Arena Materials
Term Contract
Sub-Bidding
Willcox, AZ 85643

Water Treatment Specialists
Term Contract
Sub-Bidding
Kingman, AZ 86401

Pest Control Services For Aspc- Yuma
Post-Bid
Yuma, AZ

Annual Portable Toilet Services Fy 21/22
Term Contract
Post-Bid
Prescott Valley, AZ

Tonto National Forest Portable Toilet Rental
Term Contract
Results
Scottsdale, AZ

Rent Portable Toilet and Hand Wash Units
Results
Phoenix, AZ

Bullard Wash Maintenance Construction Services
Term Contract
Sub-Bidding
Goodyear, AZ 85323

Pest Control Services
Term Contract
Post-Bid
Flagstaff, AZ

Tonto National Forest Portable Toilet and Handwash Station Rental and Service
Results
Globe, Mesa, Payson, Roosevelt, Scottsdale, Tonto Basin, AZ 85215

City Facility Energy Audit
Term Contract
Sub-Bidding
Chandler, AZ 85225

Window Cleaning Services
Post-Bid
$40,000 est. value
Scottsdale, AZ

BPA Toilet Pumping USDA-FS Apache-Sitgreaves National Forests
Term Contract
Results
Springerville, AZ

On-Call Road Maintenance and Heavy Equipment Services
Term Contract
Sub-Bidding
Globe, AZ 85501

Last Updated 08/30/2022 03:34 AM
Project Title

Hypersonic Wind Tunnel Compressed Air Supply System

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85705   (Pima County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The following specification details the minimum requirements for equipment and structure for a complete factory assembled High Pressure Compressed Air Packaged Plant System The Packaged System shall be factory fabricated, tested, and delivered to site by the manufacturer as a complete unit containing all of the items listed under Products. Field fabrication of the Packaged System is not acceptable. The Packaged System shall only require compressed air piping, supply and return chilled water connections, 460V and 120/230V electrical power connections, a data (fiber) connection, a building automation system connection, and drain piping connections as required. Technical Inquiries Due: 09/07/2022 - 12:00 pm

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents