Similar Projects
Heritage District ADA Sidewalk Improvements
Infrastructure
Bidding
$797,323 est. value
Gilbert, AZ

Parking Lot Demolition
Demolition
Bidding
AZ

Bellemont Access and Safety Project
Post-Bid
Less than $3,700,000 est. value
Flagstaff, AZ

Zoo Parking Lot - Papago Park
Post-Bid
Phoenix, AZ 85008

The Grid Mixed Use Project Site Improvements CMAR
Renovation
Results
$2,500,000 to $4,500,000 est. value
Mesa, AZ 85201

The Shores North ADA/ABA- Construction of a Sidewalk
Results
Less than $25,000 est. value
Phoenix, AZ

Residential Streets Overlay G06C, G08A, J05A and K08A
Infrastructure
Bidding
$5,200,000 to $5,500,000 est. value
Mesa, AZ

Parking Lot Drainage
Post-Bid
Window Rock, AZ 86515

Y--Painted Rock CG - ADA Concrete
Results
Phoenix, AZ 85027

Construct Sidewalks
Infrastructure
Bidding

Construction Services Relating to Tractor Supply Offsite Improvements
Post-Bid
Surprise, AZ 85374

System Enhancement (Other Enhancements)
Results
Less than $3,900,000 est. value
Gilbert, AZ 85233

North Main Street Sidewalk Improvement Project
Post-Bid
Cottonwood, AZ 86236

Parking Lot Removal and Replacement for City of Phoenix Parks
Results
Phoenix, AZ 85003

South Campus Parking Lot Paving Project
Post-Bid
Thatcher, AZ 85552

Reported 07/01/2021 12:00 AM
Project Title

Construction of on-site Improvements - Upper Parking Lot Repaving

Physical Address View project details and contacts
City, State (County) Prescott, AZ 86301   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide construction services for milling and repaving at the upper parking lot above the Yavapai Casino. The parking lot will be bid as (2) separate lots as indicated on the attached 8 ½" x 11" drawing. Lots 1 & 2 : Provide the required milling to remove the existing asphalt down to the existing ABC over the entire site. Areas where the existing asphalt is less than 3", milling will continue to allow placement of the proposed new 3" of asphalt. Millings shall be disposed of offsite by the contractor. Milling depth activities will result in the placement of the standard asphalt mix - (2) 1 ½" lifts of MAG ¾" PG 64-22 Asphalt Concrete (up to 15% RAP allowed) - 3" total.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents