Similar Projects
Fire Alarm Replacement & Installation Services
Bidding
Deerfield, NH

Airline Terminal Fire Alarm System Upgrade at Manchester-Boston Regional Airport
Post-Bid
$1,500,000 to $2,200,000 est. value
Manchester, NH 03103

Fire Alarm System Upgrade at Derry Wastewater Treatment Plant
Post-Bid
Derry, NH

Fire Sprinkler Systems Testing and Inspection
Results
Brentwood, NH

Fire Inspection Services
Results
Dover, NH

Complete Replacement of Fire Alarm System
Post-Bid
$4,000,000 to $6,000,000 est. value
Concord, NH

Child Care Center Fire Sprinkler Upgrades
Results
Rochester, NH

Sprinkler Upgrade
Post-Bid
Tilton, NH 03276

Fire Extinguisher inspections
Term Contract
Results
Merrimack, NH 03054

Bureau of Bridge Maintenance
Post-Bid
Conway, NH 03813

Fire Alarm System Inspection and Testing
Term Contract
Results
Merrimack, NH 03054

Federal Building and Courthouse Fire Alarm Replacement Design/Build
Post-Bid
$1,000,000 to $4,500,000 est. value
Concord, NH 03303

Sprinkler Inspections
Term Contract
Results
Merrimack, NH

Fire Alarm and Fire Suppression Systems Services
Term Contract
Results
Farmington, NH 03835

Replacement of Raymond High School Fire Pump the Raymond High School
Results
Raymond, NH 03077

Last Updated 07/27/2020 09:17 AM
Project Title

Fire Alarm System Upgrade at Safety Complex Building

Physical Address View project details and contacts
City, State (County) Bedford, NH 03110   (Hillsborough County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work at the Safety Complex is to include but not limited to a new addressable fire alarm panel (monitored locally), heat detectors, smoke detectors, pull stations, duct smoke detectors, combination smoke/co detectors bunk area, sprinkler flow, sprinkler tamper and horn strobes. All existing fire alarm system wiring is to be reused where possible.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents