Similar Projects
Solon Robinson ES Generator
Results
Crown Point, IN 46307

Hammond Central High School - Technology and Black Box AV Systems
Renovation
Results
Hammond, IN 46320

Light Fixture Replacement
Alteration
Results
$175,000 est. value
Munster, IN 46321

Guaranteed Energy Savings Contract
Term Contract, Alteration
Post-Bid
Gary, IN

Solar Array Procurement and Installation at Griffith Lift Station
Alteration
Post-Bid
Griffith, IN 46319

NW819 Hawthorn Hall - New Gas Boiler, Water Heater and Replacement of Switchgear
Results
Gary, IN 46400

Emergency Generator Installation at the Gary Courthouse
Alteration
Post-Bid
Gary, IN 46402

Electrical Maintenance
Alteration
Post-Bid
Crown Point, IN 46307

Scott Middle School HVAC, Electrical and Roofing
Alteration
Bidding
$1,600,000 est. value
Hammond, IN 46323

Guaranteed Savings Contract
Alteration
Results
Merrillville, IN

LED Light Fixture Installation at the Lake County Jail
Alteration
Post-Bid
Crown Point, IN

Electrical Upgrades Scattered Sites
Alteration
Post-Bid
East Chicago, IN

Wilbur Wright Middle School Light Fixture Replacement
Alteration
Results
$175,000 est. value
Munster, IN 46321

Generator System Upgrades
Alteration
Post-Bid
Munster, IN

WWTP Generator Replacement
Alteration
Results
Lowell, IN 46356

Last Updated 04/13/2022 01:56 PM
Project Title

Indiana Harbor Backup Power System, Indiana Harbor Canal, Confined Disposal Facility

Physical Address View project details and contacts
City, State (County) East Chicago, IN   (Lake County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Invitation for Bid (IFB) W912P621B0017 for work to include installation backup power system for the Indiana Harbor gradient control system on the southeast side of the facility. This backup power work will involve the installation of a 250KW generator with a 480-12.47kV step-up transformer. Additional switchgear will also have to be installed to replace the existing 4-way switch for automatic power transfer capabilities. Other work will include raising the monitoring wells above grade and adding a moisture proof enclosure above ground located in East Chicago, IN (Lake County).

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents