Similar Projects
Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Design
$10,000,000 CJ est. value
Spokane Valley, WA 99206

Stormwater for Washington Basin - Knox Avenue
Infrastructure
Bidding
$1,000,000 to $1,800,000 est. value
Spokane, WA

Cycle 9 Traffic Calming Projects
Infrastructure
Bidding
$450,000 est. value
Spokane, WA

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Bigelow Gulch Road Project Six
Alteration
Post-Bid
Spokane, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Latah Creek Golf Course Parking Lot Improvements
Infrastructure
Bidding
$476,321 est. value
Spokane, WA 99223

Evergreen Road Preservation
Infrastructure
Post-Bid
Spokane Valley, WA

Pedestrian Ramp Replacement
Infrastructure
Results
Deer Park, WA

2022 Paving Unpaved Streets - North
Infrastructure
Bidding
$250,000 to $500,000 est. value
Spokane, WA

Spokane Airport Board Unit Price Airside Pavement Rehabilitation
Term Contract
Post-Bid
Spokane, WA 99224

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

2022 Eastern Region Chip Seal - South
Infrastructure
Results
$7,000,000 to $10,000,000 est. value

Last Updated 06/13/2022 12:20 AM
Project Title

Sprague Avenue Preservation - Havana to Fancher

Physical Address View project details and contacts
City, State (County) Spokane Valley, WA   (Spokane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of ITS conduit installation, ADA ramp upgrades, Asphalt Patching, stormwater structure and gutter repairs, Bituminous Planing and HMA overlay.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents