Similar Projects
Milham Park Improvements - cip0300068 - City of Kalamazoo
Infrastructure
Conception
$1,552,000 CJ est. value
Kalamazoo, MI 49001

Verburg Park Improvements - cip0300067 - City of Kalamazoo
Infrastructure
Conception
$473,000 CJ est. value
Kalamazoo, MI 49007

Airway Fun Center: Spinning Coaster
New Construction
Design
Portage, MI 49002

33rd Street Water Main - wat0500351 - City of Kalamazoo
Infrastructure
Design
$5,339,500 CJ est. value
Kalamazoo, MI 49048

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Bid Package #01 Landscaping and Fencing
Infrastructure
Post-Bid
$100,000 CJ est. value
Schoolcraft, MI 49087

Winter Maintenance Services
Infrastructure
Post-Bid
Kalamazoo, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Stadium Drive Tank Level Control Valve Replacement
Infrastructure
Results
Kalamazoo, MI 49009

Kalexsyn: Addition
Addition - 2,040 SF
Pending Verification
Kalamazoo, MI 49008

Graphic Packaging International: Parking Lot Addition
Addition
Pending Verification
Kalamazoo, MI 49007

Cork (Portage to Sprinkle) - mst0100186 - City of Kalamazoo
Infrastructure
Conception
$3,859,000 CJ est. value
Kalamazoo, MI 49001

River's Edge Development
New Construction, Infrastructure
Design
$45,200,000 CJ est. value
Kalamazoo, MI 49007

Parkwood Upjohn Elementary School Remodel and Site Improvements
Renovation, Infrastructure
Post-Bid
Kalamazoo, MI 49001

Last Updated 03/14/2023 01:41 PM
Project Title

Michigan Avenue Patching

Physical Address View project details and contacts
City, State (County) Kalamazoo, MI 49007   (Kalamazoo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $246,450 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project shall consist of patching deteriorated sections of the roadway along Michigan Ave. from W. Main St. to Harrison St. in accordance with the specifications and documents in this contract. Patching locations will be mostly confined to those sections of the roadway specified for vehicle travel lanes. The scope of work for this project shall consist of patching deteriorated sections of the roadway along Michigan Ave. from W. Main St. to Harrison St. in accordance with the specifications and documents in this contract. Patching locations will be mostly confined to those sections of the roadway specified for vehicle travel lanes. The areas to be patched should be properly prepared, cleaned, and all exposed surfaces coated with the approved tack coat prior to patch material being placed (unless performing infrared repair). After patch material is placed the area should be rolled to achieve compaction and patch longevity. All necessary traffic control, labor, materials, tools, equipment, and other items incidental to the work being performed shall be included in the Contractor's unit price for this contract. Such items will not be bid or paid for separately but shall be included in the overall unit price. The bidder shall furnish all labor, supervision, supplies, tools, equipment, and other means necessary or proper for performing and completing the work. The bidder shall be responsible for the cleaning up of the job site and shall repair or restore all structures and property that may be damaged or disturbed during performance of the work to the satisfaction of the Public Services Department for the City of Kalamazoo. Drainage structure covers shall be salvaged and reused if in usable condition; otherwise, they shall be replaced. Where needed, all traffic control used for such operations as defined by the MMUTCD will be the responsibility of the bidder The bidder shall have all work completed by June 1, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents