Similar Projects
RFP - Audio Video (AV) Design, Install, and Maintenance
Term Contract
Conception
Salem, OR 97317

UO Retainer Program - Consulting Services - Extended Period
Renovation, Term Contract
Bidding

RFP - Professional Services for the Community Development Block Grant Rehabilitation Program
Term Contract
Bidding
Salem, OR 97301

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

ODA Aviation Engineering Services Consulting Services (Engineering/Inspection and Ca) Airport Specific
Infrastructure
Post-Bid

Storm Debris Removal Monitoring Services
Infrastructure
Results
OR

Del Webb Server Room Architectural Design
New Construction, Infrastructure
Results
Salem, OR 97301

RFQ - City Engineering Services
Term Contract
Bidding
Keizer, OR 97303

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

RFP - Bathymetric Survey Services
Term Contract
Bidding
Salem, OR 97317

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Architectural and Engineering and Related Services for the Public Work Administration Building Addition and Remodel
Renovation, Alteration
Results
Salem, OR 97305

RFP - Solid Waste Management System
Term Contract
Bidding
Salem, OR 97301

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

Last Updated 03/02/2023 04:21 PM
Project Title

RFP - OWRDs Dam Safety Project News and Update

Physical Address View project details and contacts
City, State (County) Salem, OR 97301   (Marion County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this analysis contract is to fund an options evaluation that will inform decision making to address the issue with the conduit of Wageman Dam. The conduit through Wageman Dam is a thin walled steel pipe that dates to 1969 making the conduit more than fifty years old, well past the designed life. The last time the conduit was operated, water was observed exiting the dam around the outside of the conduit. This indicates there are holes in the conduit. As a result, the conduit is no longer operated. In addition, the size of the conduit is insufficient so slip lining the conduit is not an option. The conduit needs to be replaced or an alternative means to drain the reservoir needs to be developed. The Method of Contractor Selection has not been Determined at this time

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents