Similar Projects
Intersection - CLE-SR 131-02.09
Bidding
OH

But-129-25.00, Sr 129 / Liberty Way / I75 Interchange Project
Bidding
Less than $24,610,040 est. value
OH

Chip and Seal Bid
Post-Bid
Sullivan, OH 44880

Hocking College Lodge Pavement Replacement Project
Post-Bid
Less than $450,000 est. value
Nelsonville, OH 45764

Tylersville Road Improvements, Phase II
Results
Middletown, OH

Resurfacing of Selected Township Roads
Results
Bethel, OH

Minor Reconstruction - CLI-US 22-11.75 - Pt. 1 (PART 1 and PART 2)
Bidding
Wilmington, OH

Fema Disaster Event Dr-4360
Post-Bid
Martins Ferry, OH 43935

2019 Paving Improvements at Various Fairfield City School District Facilities
Results
Less than $181,700 est. value
Fairfield, OH

Crack Sealing - D05 CS FY2021
Bidding
Buckeye Lake, Corning, Hebron, Nellie, Rendville, Warsaw, OH

Hot Mix Asphalt
Term Contract
Post-Bid
Conneaut, OH 44030

Selwyn Road Resurfacing and Waterline Replacement
Results
$1,478,691 est. value
Cleveland Heights, OH 44118

Spot Patching / Pavement Repair - D11 SP FY2021
Bidding

Cold Mix Asphalt
Post-Bid
Conneaut, OH 44030

Two Lane Resurfacing - SR 7/SR 531-31.37/21.21
Results
Conneaut, OH 44030

Reported 12/08/2020 12:00 AM
Project Title

Phase V CSO Improvements Project

Physical Address View project details and contacts
City, State (County) McConnelsville, OH   (Morgan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,604,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered by the Contract Documents includes the following: Phase V CSO Improvements Project – Construction of approximately 2,200 linear feet of storm sewer, along with catch basins, curb inlet, manholes, and headwalls. The project also consists of utility relocation to perform the storm sewer separation as well as site restoration such as pavement replacement, curb replacement, and sidewalk replacement. Alley Paving Project – The alley paving project plans are included within the Phase V CSO Improvements project. This portion of the project consists of 5,900 square yards of pavement resurfacing, part of which requires planing, along alleys throughout the Village. Kennebec Sidewalk Project - The sidewalk project plans are included within the Phase V CSO Improvements project. This portion of the project consists of 500 linear feet of 4 ft wide sidewalk installation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents