Similar Projects
Crescent Harbor Elementary School
New Construction
Conception
$68,000,000 est. value
Oak Harbor, WA 98277

Oak Harbor Elementary School
New Construction
Conception
$75,000,000 est. value
Oak Harbor, WA 98277

Construction of the Transportation Cooperative
New Construction, Infrastructure
Design
$7,570,000 CJ est. value
Selah, WA 98942

Construction of the Transportation Cooperative
New Construction, Infrastructure
Design
$7,570,000 CJ est. value
Selah, WA 98942

Small Works Roster
Renovation
Bidding
Less than $350,000 est. value
Nooksack, WA

RFQ D/B - Northshore School District Modernization and/or Additions Projects
Addition, Demolition, Renovation, Infrastructure
Bidding
$30,750,000 CJ est. value
Bothell, WA 98011

Avanti High School and Annex Remodel
Renovation
Post-Bid
Olympia, WA 98501

District Maintenance Building Improvements
New Construction
Post-Bid
$2,350,000 est. value
Steilacoom, WA

Fire Alarm Maintenance And Repair Service
Renovation, Alteration
Results
Vancouver, WA 98686

Fire Alarm Maintenance And Repair Service
Renovation, Alteration
Results
Vancouver, WA 98686

East Olympia Elementary School (EOE) / (THES) Tumwater Hill Elementary School Illness Room Renovation Projects
Renovation
Construction
$173,938 CJ est. value
Tumwater, WA 98501

Sunnyland Elementary School
Renovation, Addition
Pending Verification
Bellingham, WA 98225

Vancouver Innovation Center
New Construction, Infrastructure, Build-out, Renovation - 930,000 SF
Pending Verification
$830,000,000 CJ est. value
Vancouver, WA 98683

Olympic Valley Elementary School
New Construction
Conception
$67,000,000 est. value
Oak Harbor, WA 98277

High School Addition
New Construction - 22,500 SF
Design
Ridgefield, WA

Last Updated 09/02/2022 12:33 PM
Project Title

Columbia Cottage and Treatment Mall Renovation

Physical Address View project details and contacts
City, State (County) Centralia, WA 98531   (Lewis County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,373,100 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated Bid Cost Range: $3,000,000.00 to $3,300,000.00 For bid proposals exceeding $1M, each bidder shall submit: Form A (HVAC, Plumbing, and Electrical) with its bid proposal or within one hour after the bid submittal time/date. Form B (Structural Steel Install, Rebar Install) within 48 hours after the bid submittal time/date. Forms A and B must be emailed to: FPSsubcontractorlist@des.wa.gov. Participants are required to be fully vaccinated in accordance with the Governor's Proclamation 21-14.1 - COVID-19 VACCINATION REQUIREMENT, and further, must comply with COVID-19 Vaccination And Safety Guidelines And Requirements for Pre-Bid Meetings and Site Visits established by the Department of Enterprise services and the Department of Corrections. For specific directions for an on-site pre-bid meeting or site visit, please contact the Consultant listed below. In response to the COVID-19 global pandemic and in an effort to keep our contractors and staff healthy, the Department of Enterprise Services Facility Professional Services (FPS) is making changes to the Public Works bid submittal and bid opening process. FPS will be accepting mailed-in or hand-delivered bids. Contractors are highly encouraged to mail bids whenever possible in an effort to stay home and stay healthy. Clearly identify that it is a SEALED BID on the outside of the envelope. Include an attention line in the address to ensure that the bid is routed correctly. For hand-delivering bids, a locked drop box will be available outside the 1500 Jefferson St. S.E. building for contractors to deposit their sealed bids. We ask that you please maintain a distance of at least six feet from all other individuals when dropping off bids. An FPS staff member will be inside the lobby monitoring the locked drop box during those hours. Additionally, all Public Works Bid Openings will be conducted via live stream on YouTube. A link to the live stream for bid opening can be found above. Contractors and the public will not be allowed to stay to watch the bid opening in person. We will strive to begin bid opening live streams within thirty minutes of the bid closing and appreciate your patience as we deploy this new process. If you have questions, please contact us at EASMail@des.wa.gov or call (360) 902-7272. Please direct questions regarding this project to the office of the Consultant, DLR Group, Lorraine Leslie, lleslie@dlrgroup.com, 206-792-3914. Within 72 hours following the bid opening, results will be available on the FPS website. The State of Washington prevailing wage rates are applicable for this public works project located in Thurston County. Bidders are responsible to verify and use the most recent prevailing wage rates. The "Effective Date" for this project is the Bid Form due date above. The applicable prevailing wage rates may be found on the Department of Labor & Industries website located at website. Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary workforce diversity goals for this apprentice participation are identified in the Instructions to Bidders and the General Conditions for Washington State Facility Construction. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. In accordance with RCW 39.30.060, if the base bid and the sum of the additive alternates is one million dollars or more, the Bidder is required to provide the names of the Subcontractors with whom the Bidder will directly subcontract for the performance of heating, ventilation and air conditioning (HVAC), plumbing and electrical for this project on Subcontractor List Form A within one hour of the bid submittal time via email to FPSsubcontractorlist@des.wa.gov. The Bidder shall also provide names of the Subcontractors with whom the Bidder will subcontract for structural steel installation and rebar installation on Subcontractor List Form B within 48 hours of the bid submittal time via email to FPSsubcontractorlist@des.wa.gov. Supplemental Bidder Responsibility will be evaluated for this project. In determining Bidder responsibility, the Owner shall consider an overall accounting of the criteria set forth in "DIVISION 00 SUPPLEMENTAL RESPONSIBILITY CRITERIA". Please direct questions regarding this subject to the office of the Consultant. The successful bidder is required to comply with the COVID-19 Safety and Vaccination Verification Declaration Requirements in the Supplemental Conditions for Washington State Facilities Construction and provide the Vaccination Verification Declaration prior to award of the contract. The successful Bidder is required to register and create an account in the DES Diversity Compliance program (B2Gnow) at website. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Achievement of the goals is encouraged. Bidders may contact the Office of Minority and Women's Business Enterprise (OMWBE) at website to obtain information on certified firms. Bidders may also utilize Washington Small Businesses registered in WEBS at website and Veteran-owned Businesses at website. The State reserves the right to accept or reject any or all bids and to waive informalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents