Similar Projects
Last Updated | 06/08/2023 10:04 AM |
Project Title | RFP Contractor- General Contractor Services Midvale Elementary School and DeKalb High School of Technology South Major Building System Replacement |
Physical Address | View project details and contacts |
City, State (County) | Tucker, GA 30084 (DeKalb County) |
Category(s) | Education |
Sub-Category(s) | Elementary School, Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,400,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To provide General Contractor services for the construction of the Owners Construction Project at Midvale Elementary School and DeKalb High School of Technology-South Major Building System Replacement as specified per the Proposal Documents. Selection Committee Evaluation June 5-9, 2023 Anticipated Board Review and Approval August 14, 2023 Anticipated Notice of Award August 21, 2023 Anticipated Notice to Proceed September 2023 Scope will consist of the following: The Contractor shall supply materials, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature, and other services and facilities necessary to complete the construction at the described facilities, including, but not limited to, incidental work described in the Contract Documents. Midvale Elementary School HVAC replacement- new chiller and unit ventilators with 4-pipe system New Controls New Sprinkler system New Ceilings and LED Lights in corridors. Renovate Exceptional Ed Pre-K and Clinic Restrooms for ADA compliance New Roof New Bottle fillers New Elevator addition New Lift at Cafetorium stage New VCT in Cafetorium Renovate Kitchen Restroom into one unisex ADA accessible restroom with lockers vestibule. Renovate Rm. 118, 121.1 and 121.2 for code compliance- New CMU wall, flooring, ceiling and lighting will be provided. DeKalb High School of Technology-South School HVAC replacement New Sprinkler system New Fire System Plumbing fixture replacement New Bottle fillers New Insulated Glazing and Sun Shading on the buildings south side. New insulated coiling doors at the buildings south side ground level, and the north sides second floor. New Exit at Auto Body classroom New Ceilings and LED Lights in corridors New elevator in existing shaft- 2-stage hydraulic elevator without machine room. Renovate the 4 existing restrooms for ADA compliance. Renovate Guardrails at both stairways- add an additional picket between the existing pickets. Except as expressly provided in, or permitted by, the Proposal Documents, from the date of issuance of the RFP until final Owner action of approval of contract award, the Contractor submitting a Proposal shall not initiate any communication or discussion concerning the Project, the RFP or the Contractors Proposal or any part thereof with any employee, agent, or representative of the Owner. Any violation of this restriction may result in the rejection of the Contractors Proposal. The Owner reserves the right to reject any or all proposals, and to waive technicalities and informalities. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |