Similar Projects
2021 Bridge Repairs
Post-Bid
Saint Pete Beach, FL 33706

Design-Build Services for Bridge Mitigation Improvements (McCoy`s Creek) Raise Bridges -Stockton and King-PQ-Marine or Horizontal
Post-Bid
Jacksonville, FL 32204

Davis Islands Bridge 105606 Repair
Results
Less than $365,800 est. value
Tampa, FL 33602

Southwest 42nd Avenue Over Coral Gables Canal Bridge No. 874275 Beam Repairs
Results
Less than $84,658 est. value
Miami, FL 33128

Sun Island Exit Bridge Over Boca Ciega Bay - Bridge #157601
Renovation
Construction
South Pasadena, FL

Design Build-Step 1-Golden Gate Pkwy over Santa Barbara Canal Bridge Replacement
Post-Bid
Less than $5,200,000 est. value
FL

Apollo Beach Extension from US 41 to Paseo Al Mar Boulevard
Results
Less than $20,251,907 est. value
Apollo Beach, FL 33572

Bridge Replacement at SW 136 Street Over C-100A Canal - Bridge No. 874420
New Construction
Post-Bid
$1,707,083 est. value
FL

Murphy Road Bridge Replacement
Results
$4,700,000 est. value
Stuart, FL

Construction Services for Project Improvements Bella Vita Subdivision Phase 1B-1 and 1B-2 Berry Lane Bridge over Horse Creek
Post-Bid
FL

Add Lanes and Reconstruct
Results
Less than $21,311,782 est. value
Palm City, FL 34990

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Bridge 260086 Rehabilitation - CR 241 over Santa Fe River and Bridge 260027 Rehabilitation - CR 325 over Cross Creek
Results
Less than $430,000 est. value
FL

Bridge-Repair/Rehabilitation
Results
Less than $18,559,433 est. value
Milton, FL 32570

Bimini Drive Bridge (904603) Replacement Project
Results
Key West, FL 33040

Reported 05/26/2022 12:00 AM
Project Title

Repair Of Sadowski Causeway Bridge

Physical Address View project details and contacts
City, State (County) Key Colony Beach, FL 33051   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide general structural repairs to the Sadowski Causeway bridge, including but not limited to concrete spalling repair, epoxy injection, carbon fiber reinforced polymer installation, rip rap re-setting, and installation of cathodic protection system to seawalls at both sides of the channel.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents