Similar Projects
Z--COLO 253093 York River Shoreline Stabilization 2B
Design
$10,000,000 est. value
Yorktown, VA

Shillelagh Road Drainage and Shoulder Improvements
Infrastructure
Bidding
Chesapeake, VA 23325

Culvert Replacement
Infrastructure
Bidding
$1,377,000 est. value
VA

Kessler Mill Drainage Improvements
Post-Bid
Salem, VA

Mill Street Drainage Improvements
Post-Bid
Dayton, VA

NASA Wallops Beach Renourishment (Backpassing)
Results
$10,000,000 to $25,000,000 est. value
Wallops Island, VA 23303

Pipe Rehabilitation VDOT Culpeper District
Term Contract
Results

SGR - Culvert Replacement
Infrastructure
Bidding
$2,277,000 est. value

Drainage Improvements Fairfax Camp 30 AHQ Maintenance Facility
Post-Bid
Fairfax, VA 22030

Lynnhaven River Basin Ecosystem Restoration, Phase 1 Reef Habitat
Results
$1,000,000 to $5,000,000 est. value
Virginia Beach, VA

SGR - Culvert Replacement
Infrastructure
Bidding
$1,333,000 est. value
VA

Water Management Infrastructure
Post-Bid
Suffolk, VA 23434

Jetty Construction Located on Tangier Island, VA
Results
$1,000,000 to $5,000,000 est. value
Tangier, VA 23440

Rabbit Branch at Collingham Drive
Alteration
Bidding
VA

Concrete Pipe
Post-Bid
Lebanon, VA 24266

Last Updated 08/19/2021 12:14 PM
Project Title

Hunts Fork Drainage Maintenance II

Physical Address View project details and contacts
City, State (County) Hurley, VA 24620   (Buchanan County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $70,000 to $110,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In summary, the scope of work shall consist of mobilization of the contractor’s workforce and equipment, construction site preparation, installation of erosion and sediment controls, installation of a temporary stream crossing, repair of an access road, excavation and slope stabilization of two (2) landslide features, re-establishment and reshaping of a roadside ditch, construction of a drainage swale, removal of an 18" CMP, revegetation and clean up and repair of damage to the project site.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents