Similar Projects
Street Improvements
Bidding
$3,600,000 est. value
Pittsfield, MA

Annual Streetscape Maintenance
Post-Bid
Less than $25,000 est. value
Pittsfield, MA

Streetscape Maintenance for Three Years
Post-Bid
Less than $90,000 est. value
Pittsfield, MA

Full Depth Reclamation - Frd Crooked Hill Road
Results
Alford, MA 01230

HMA Paving
Results
Less than $175,000 est. value
Alford, MA 012308

SAMI (Asphalt-Rubber Surface Treatment)
Post-Bid
Mill River, MA 01244

Resurfacing and Related Work on the Ashuwillticook Rail Trail
Results
Less than $4,367,000 est. value
Adams, Cheshire, Lanesborough, MA 01220

Statewide Airport Pavement Maintenance Project
Post-Bid
Less than $1,500,000 est. value

Resurfacing and Related Work along a Section of Route 7 (New Ashford Road)
Results
Less than $3,007,000 est. value
New Ashford, MA 01237

Statewide Pavement Maintenance and Pavement Markings at Various Public-Use Airports
Post-Bid
Less than $1,500,000 est. value
Wakefield, MA

Resurfacing and Related Work along a Section of Interstate 90 Westbound
Results
Less than $8,466,187 est. value

Yokum Pond FDR and HMA
Post-Bid
Less than $365,000 est. value
Becket, MA 01223

East and West Street Paving FY 2020 Mount Washington Road Improvements
Results
Less than $389,012 est. value
Mount Washington, MA 01258

2020 West Center Road Paving
Post-Bid
Less than $560,000 est. value
West Stockbridge, MA

Resurfacing and Related Work on a Section of Route 2 (Mohawk Trail)
Results
Less than $5,312,000 est. value
Florida, Savoy, MA 01247

Last Updated 04/14/2021 10:42 AM
Project Title

Resurfacing and Related Work on A Section of Interstate 90

Physical Address View project details and contacts
City, State (County) Becket, Otis, MA   (Berkshire County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,266,676
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $80,000","100." "120.000","Cy","Earth Excavation","120." "1.000","Cy","Class a Rock Excavation","121." "50.000","Cy","Class a Trench Excavation","141." "50.000","Cy","Test Pit For Exploration","141.1" "1.000","Cy","Class b Rock Excavation","144." "150.000","Cy","Gravel Borrow - Type c","151.01" "20.000","Ton","Crushed Stone","156." "320.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ton","Disposal Of Treated Wood Products","184.1" "5.000","Ea","Drainage Structure Adjusted","220." "130.000","Ft","Drainage Structure Rebuilt","220.2" "70.000","Ea","Large Hook Lock Bar Grate – Furnished And Installed","222.4" "40.000","Cy","Removal Of Drainage Structure Sediment","227.3" "6660.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "220.000","Sy","Hot Mix Asphalt Waterway","280." "60.000","Ton","Hot Mix Asphalt Waterway","280.1" "50.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "15100.000","Ft","Pavement Milling Mulch For Shoulders","402.13" "313500.000","Sy","Pavement Fine Milling","415.2" "43890.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - p)","450.231" "880.000","Ton","Hma For Patching","451." "22000.000","Gal","Asphalt Emulsion For Tack Coat","452." "149000.000","Ft","Hma Joint Sealant","453." "100.000","Ton","Temporary Asphalt Patching","472." "144400.000","Ft","Milled Rumble Strip (Type a)","477." "97200.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "10400.000","Ft","Guardrail, Tl-3 (Double Faced)","621.13" "30.000","Ea","Trailing Anchorage","627.1" "4.000","Ea","Guardrail End Treatment, Tl-3 (Double Faced)","627.73" "30.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "6.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "12.000","Ea","Transition To Rigid Barrier (Single Faced)","628.22" "24.000","Ea","Transition To Bridge Rail","628.24" "560.000","Ft","Precast Concrete Barrier –Single Faced (42” Tall)","629.13" "140.000","Ft","Precast Concrete Barrier –Single Faced (32” To 42” Tall Transition)","629.14" "114800.000","Ft","Highway Guard Removed And Discarded","630.2" "24.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "250.000","Cy","Loam Borrow","751." "2510.000","Sy","Seeding","765." "15500.000","Ft","Sediment Control Barrier","767.121" "2150.000","Sy","Straw Mulch","767.31" "114800.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "60.000","Ea","Delineation For Guard Rail Termini","833.7" "400.000","Day","Traffic Cones For Traffic Management","851.1" "1450.000","Sf","Safety Signing For Traffic Management","852." "800.000","Day","Truck Mounted Attenuator","853.403" "400.000","Day","Temporary Illumination For Work Zone","853.8" "163300.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "21770.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "280.000","Day","Temporary Portable Rumble Strip","854.6" "2400.000","Day","Arrow Board","856." "1600.000","Day","Portable Changeable Message Sign","856.12" "40000.000","Day","Reflectorized Drum","859." "1200.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "910.000","Ea","Slotted Pavement Marker One-Way White","864.31" "90700.000","Ft","6 Inch Wet Reflective Recessed White Line (Polyurea)","868.206" "72560.000","Ft","6 Inch Wet Reflective Recessed Yellow Line (Polyurea)","869.206"

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents