Similar Projects
Freedom Trail Phase III 2022 Extension
Infrastructure
Post-Bid
Akron, OH

Replacement and/or Repair of Concrete Sidewalks, Curbs/Ramps and Drive Approaches
Infrastructure
Post-Bid
$205,582 est. value
Cuyahoga Falls, OH

Mcdonnell Trailhead to Bolivar Towpath Trail Connection General Contract
Results
$374,700 est. value
Akron, OH 44308

SUM-91-9.96 Sidewalks
Results
$728,986 est. value
Stow, OH

Richfield Elementary Parking Lot Renovation
Infrastructure
Post-Bid
$1,200,000 est. value
Richfield, OH 44286

2021 Parks Pavement Maintenance
Results
Less than $48,092 est. value
Green, OH 44232

Broadview Sidewalks
Infrastructure
Post-Bid
$200,000 est. value
Richfield, OH 44286

Concrete Maintenance and Repair
Results
$118,000 est. value
Tallmadge, OH

Grant Street Extension and Parking Lot Construction
Infrastructure
Post-Bid
$200,000 est. value
Richfield, OH 44286

2021 Concrete and Catch Basin Replacement Program
Results
Hudson, OH

Front Street Summit DD Parking Lot Expansion
Results
Less than $606,695 est. value
Cuyahoga Falls, OH 44224

Nordonia Hills Branch Parking Lot Improvements
Results
Northfield, OH 44067

Annual Sidewalk, Curb and Ramp and Drive Approach Replacement Program
Results
$211,317 est. value
Cuyahoga Falls, OH

Macedonia Family Recreation Center - Parking Lot Resurfacing
Results
Less than $280,000 est. value
Macedonia, OH

Mud Brook Greenway Trail Phase I
Results
Stow, OH 44224

Last Updated 05/17/2022 09:10 AM
Project Title

Veterans Trail Phase 3

Physical Address View project details and contacts
City, State (County) Hudson, OH   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,177,594 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work consists of the installation of an approximate 6,000-foot gravel path to include fencing, drainage, and a pedestrian bridge from Barlow Road to Veterans Way in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the City Engineer.

Details

Division 02 - Existing Conditions, Snow Control, Snow Fencing.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Subdrainage, Drainage Layers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents