Similar Projects
Gould Street Water Main Replacement
Infrastructure
Bidding
$1,100,000 est. value
Beecher, IL 60401

Ottawa Water Main Improvements
Infrastructure
Bidding
Joliet, IL

Fifth Street to Ninth Street Roadway and Water Main Improvements
Post-Bid
Lockport, IL

Roadway Reconstruction, Water Main Installation, Storm Sewer Installation, Sidewalk Reconstruction
Post-Bid
Lockport, IL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Forest Park Phase 2 Water Main Improvements
Results
Less than $3,225,000 est. value
Joliet, IL 60432

Vetter Road Segment II Roadway Reconstruction & Realignment Drainage Improvements
Addition
Construction
Joliet, IL

Water Main Improvements
Infrastructure
Post-Bid

Garnsey Park Phase 2 Water Main Improvements
Results
Less than $2,263,890 est. value
Joliet, IL 60435

Water and Sewer Lines
Infrastructure
Post-Bid
Homer Glen, IL

Reedwood Phase 1A Water Main Improvements
Results
Less than $850,000 est. value
Joliet, IL 60436

Water Main Replacement Project 2
Infrastructure
Post-Bid
New Lenox, IL

Reedwood Phase 1B Water Main Improvements
Results
Less than $850,000 est. value
Joliet, IL 60436

2022 On-Call Excavation and Underground Utility Repair
Infrastructure
Post-Bid
Joliet, IL

Florence Park Phase 1A Water Main Improvements
Results
Joliet, IL 60433

Last Updated 02/02/2022 11:14 PM
Project Title

Laraway Road Water Main Improvements

Physical Address View project details and contacts
City, State (County) Joliet, IL 60436   (Will County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed construction consists of installing approximately 97 lineal feet of new 6-inch ductile iron water main and 6,001 lineal feet of new 16-inch ductile iron water main, including new hydrants, valves; and other miscellaneous items of work. The contract will include all work necessary to install the water main, install water service lines via directional drilling or open cut methods, reconnect existing water service lines, restore the roadway, and perform all restoration to return the area to its original condition.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents