Similar Projects
Contractor - HVAC Repairs
Alteration
Design
$250,000 to $500,000 est. value
Westhampton Beach, NY 11978

2021 Bond Issue Phase 1 Packet 3 - Contract #5 HVAC Reconstruction
Renovation
Sub-Bidding
Smithtown, NY 11787

Capital Improvement Program Contract #4 - Hvac Reconstruction
Renovation
Sub-Bidding
$400,000 CJ est. value
Holtsville, NY 11742

HVAC System Replacement
Alteration
Post-Bid
Holbrook, NY 11741

Cogeneration Systems Preventive Maintenance And Repair
Term Contract
Post-Bid
Deer Park, NY 11729

Building Automation System Repairs (Hvac)
Alteration
Results
$250,000 to $500,000 est. value
Shoreham, NY 11786

Cooling Tower Maintenance and Water Treatment
Term Contract
Results
Stony Brook, NY

Repair of Boat House Furnace
Term Contract
Post-Bid
Babylon, NY 11702

HVAC Mechanical Upgrades Phase 2
Alteration
Results
Patchogue, NY 11772

South Ocean MS Unit Ventilator Reconstruction
Renovation, Alteration
Post-Bid
$1,750,000 est. value
Patchogue, NY 11772

Auditorium at East Islip Middle School
Alteration
Results
Islip Terrace, NY 11752

HVAC Repair and Maintenance
Alteration
Post-Bid
Islandia, NY 11749

Replace Heating System
Alteration
Results
$500,000 to $1,000,000 est. value
Babylon, NY 11702

Cath/EP Lab Renovations HVAC Controls
Renovation, Alteration
Post-Bid
Stony Brook, NY 11794

On-Call Landfill Administration Buildings HVAC System Maintenance
Term Contract
Results
Yaphank, NY 11980

Last Updated 05/22/2023 04:38 PM
Project Title

Unit Ventilator Upgrades Rebid at the Sag Harbor Elementary School and Pierson Middle/high School

Physical Address View project details and contacts
City, State (County) Sag Harbor, NY 11963   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center - 01/05/22
Owner View project details and contacts
Architect View project details and contacts
Description

Unit Ventilator Upgrades at the Sag Harbor Elementary School and Pierson Middle/high School If proposals are submitted via delivery service (i.e. Fed-ex, UPS, in-person), building staff will be available to accept deliveries between the hours of 9 A.M. and 4:30 P.M. Monday through Friday. If bids are submitted in person a drop box will be located within the receptionist's lobby Checks or money orders shall be made payable to SAG HARBOR UNION FREE SCHOOL DISTRICT. Plan deposit is refundable in accordance with the terms in the Instructions to Bidders to all submitting bids. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Please note REVplans is the designated location and means for distributing and obtaining all bid package information. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. The Provider takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may have been issued All bid addenda will be transmitted to registered plan holders via email and will be available at portal Plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. Bids must be made in the standard proposal form in the manner designated therein and as required by the specifications that must be enclosed in sealed envelopes bearing the name of the job and name and address of the bidder on the outside, addressed to: SAG HARBOR UNION FREE SCHOOL DISTRICT, clearly marked on the outside: Re-Bid For: Unit Ventilator Upgrades at the Sag Harbor Elementary School and Pierson Middle-High School. Each proposal submitted must be accompanied by a certified check or bid bond, made payable to the SAG HARBOR UNION FREE SCHOOL DISTRICT, in an amount equal to five percent (5%) of the total amount of the bid, as a commitment by the bidder that, if its bid is accepted, it will enter into a contract to perform the work and will execute such further security as may be required for the faithful performance of the contract. Certification of bonding company is required for this bid, see Instructions for Bidders section. Each bidder shall agree to hold his/her bid price for forty-five (45) days after the formal bid opening. A pre-bid meeting and walk thru will not be scheduled for this re-bid project. Potential bidders can request a walk thru with the school district's Facilities Director, Paul Wilken. It is the Board's intention to award the contracts to the lowest qualified bidder providing the required security who can meet the experience, technical and budget requirements. The Board reserves the right to reject any or all bids, waive any informality and to accept such bid which, in the opinion of the Board, is in the best interests of the School District.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents