Similar Projects
Conway Medical Center
New Construction
Conception
Conway, SC

McLeod Health Hospital Expansion
New Construction
Conception
$56,000,000 est. value
Myrtle Beach, SC 29579

South of the Broad Healthcare Micro Hospital
New Construction - 65,000 SF
Design
$44,000,000 est. value
Bluffton, SC

Caroline's Cottage
New Construction
Design
$5,000,000 est. value
Okatie, SC

SCDMH Lake City MHC Interior Renovation
Renovation
Post-Bid
$125,000 to $160,000 est. value
Lake City, SC 29560

Henry and Mollie Fair Memory Disorder Clinic
Renovation
Post-Bid
Charleston, SC 29425

USAF Engineering Infrastructure Repair (EIR) MATOC
Results
$100,000 to $250,000,000 est. value

USAF Engineering Infrastructure Repair (EIR) MATOC
Results
$100,000 to $250,000,000 est. value

Summerville Medical Center Emergency Department
Renovation, Addition - 39,000 SF
Construction
$14,796,753 est. value
Summerville, SC 29483

Clinical Sciences Building High Risk Infectious Disease Unit
Construction
$1,000,000 to $2,000,000 est. value
Charleston, SC 29425

University Hospital - 4th Floor Burn Center - Phase 1
Post-Bid
$250,000 to $450,000 est. value
Charleston, SC 29425

Greenville Zoo Animal Hospital Renovation
Renovation
Results
Greenville, SC 29601

Self Regional Healthcare
Renovation
Construction
$45,369 est. value
Greenwood, SC 29646

Medical University Hospital Authority - Williamsburg Regional Replacement Hospital
New Construction - 75,000 SF
Post-Bid
$26,000,000 to $32,000,000 est. value
SC

Bryan Psychiatric Hospital Learning Lab Renovation
Renovation
Results
$150,000 to $180,000 est. value
Columbia, SC 29203

Last Updated 03/11/2020 11:32 AM
Project Title

MRMC Pavilion Renovations

Physical Address View project details and contacts
City, State (County) Florence, SC 29506   (Florence County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Qualified Bidding.
Project Status All GC Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Hospital, 3 Stories Above Grade, Approximately 20,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 05 - Metals, Structural Steel Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Wood Casework, Plastic-Laminate-Clad Architectural Cabinets.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Resilient Flooring, Resilient Tile Flooring, Carpeting, Tile Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories, Lockers, Metal Lockers.
Division 11 - Equipment, Laboratory Equipment, Biological Safety Cabinets.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents