Similar Projects
West Duwamish CSO Storage
New Construction
Conception
$32,000,000 est. value
WA

Dutchman Construction
New Construction
Conception
$5,830,000 est. value
WA

21 Boston Mixed Use Development
New Construction - 273,000 SF
Design
Seattle, WA 98109

Central Maintenance Facility
New Construction
Design
$29,000,000 est. value
WA

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

GAOA Alt/Repair Construction Services MATOC
Renovation
Results

Central Maintenance Facility (Renton Shop)
New Construction
Results
$31,707,852 est. value
Renton, WA 98056

RFQ Engineering - Fort Dent Repairs Project
Infrastructure
Pending Verification
$692,119 CJ est. value
Issaquah, WA 98029

Willowmoor Construction
New Construction
Conception
$10,000,000 est. value
WA

Upcoming Projects O`Connell
Renovation
Design
$500,000 est. value
WA

South MATOC IDIQ On-Ramp
New Construction
Post-Bid
Less than $30,000,000 est. value

USPS IQ JOC Washington
New Construction, Renovation
Results
Less than $10,000,000 est. value

Old Jeffs Farm Revetment
New Construction
Conception
$2,900,000 est. value
WA

Stossel Long Term Project Construction
New Construction
Design
$2,600,000 est. value
WA

Last Updated 08/22/2022 04:34 PM
Project Title

Airport Office Renovation Project

Physical Address View project details and contacts
City, State (County) Renton, WA 98057   (King County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $375,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Airport Renovation Project Please direct questions regarding this project to William Adams, Project Manager at Renton Municipal Airport, phone 206- 775-6862 or email wadams@ rentonwa.gov by 3:00 PM Friday, n JULY 22 2022. (Document clarification questions must be submitUtiice ^ed jn writ,ing.) The City's fair practices/nondiscrimination policies and the State of Washington prevailing wage rates are applicable for this public works project located in King County. Bidders are responsible to verify and use the most recent prevailing wage rates. The "Effective Date" for this project is the Bid Form due date above. The applicable prevailing wage rates may be found on the Department of Labor & Industries website Mandatory 15% apprentice labor hours of the total labor hours are a requirement, of the construction contract. Voluntary workforce diversity goals for this apprentice participation are identified in the Instructions to Bidders and Supplemental Conditions. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. In accordance with RCW 39.30.060, the Bidder is required to provide the names of the Subcontractors with whom the Bidder will directly subcontract for the performance of heating, ventilation and air conditioning (HVAC), plumbing and electrical for this project. In accordance with RCW 39.30.060, the Bidder is required to provide the names of the Subcontractors with whom the Bidder will directly subcontract for the performance of heating, ventilation and air conditioning (HVAC), plumbing and electrical for this project. The City reserves the right to accept or reject any or all bids and to waive informalities. ESTIMATED BASE BID COST RANGE: $300,000 to $375,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents