Similar Projects
Tyndall AFB Civil Works IDIQ Sources Sought
Design
Panama City, FL 32403

Aircraft Overflow Apron and Mitigation Key West International Airport
Infrastructure
Bidding
Key West, FL 33040

Vac Apron at Space Coast Regional Airport
Infrastructure
Bidding
Titusville, FL 32780

Homestead ARB BAK 12
Post-Bid
$1,000,000 to $5,000,000 est. value
Homestead, FL 33033

Remove, Re-Grade, and Install New Rubberized Surface Material Under Static Aircraft Mounds.
Post-Bid
Panama City, FL 32403

Repair Cracks, Joints, Slabs, Airfield
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

Jacksonville International Airport Cargo Apron Expansion
Infrastructure
Bidding
Jacksonville, FL 32218

Taxiway Delta Phase II Reconstruction
Post-Bid
Pompano Beach, FL 33060

Rehabilitate, Mark, and Light Taxiways B, C and L Phases 2 and 3 at Orlando Sanford International Airport
Results
Sanford, FL 32773

Runway 18L/36R Asphalt Keel Reconstruction
Infrastructure
Bidding
Jacksonville, FL 32221

Airport East Apron Rehabilitation
Post-Bid
Lake Wales, FL 33859

Cecil Airport Taxiway A Pavement Repairs
Results
Jacksonville, FL 32218

Airfield Signage and Electrical Upgrades
Infrastructure, Alteration
Bidding
Fort Pierce, FL 34946

Magnetic Variance Change, Change Runway 1/19 Designation to Runway 2/2
Post-Bid
$500,000 to $1,000,000 est. value
Eglin AFB, FL

Last Updated 11/02/2021 09:10 AM
Project Title

Everglades Airpark Runway 15-33 Rehabilitation - Grant Funded

Physical Address View project details and contacts
City, State (County) Everglades City, FL 34139   (Collier County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,748,853
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of evaluating and preparing plans for the rehabilitation of the existing runway. This report has been developed to provide geotechnical support through pavement cores, auger borings, Standard Penetration Test (SPT) borings, and laboratory testing.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment, Airfield Signals, Airfield Runway Identification Lights, Airfield Runway and Taxiway Inset Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents