Metro Chrysler Jeep Ram Dealership Addition
Addition, Demolition, Infrastructure, Renovation - 3,780 SF
Conception
$600,000 CJ est. value
Chicopee, MA 01020

White Hut / Holyoke
Renovation, Infrastructure
Conception
$200,000 CJ est. value
Holyoke, MA 01040

Dunkin' / Holyoke
Demolition, New Construction, Infrastructure - 2,520 SF
Design
$750,000 CJ est. value
Holyoke, MA 01040

Allston Multimodal Project - Massachusetts Department of Transportation (massDOT)
New Construction, Infrastructure
Design
$1,200,000,000 CJ est. value
Brimfield, MA 01010

Library Commons Phase II
New Construction, Infrastructure
Bidding
$11,000,000 CJ est. value
Holyoke, MA 01040

RFP - Purchase and Redevelopment of Vacant Lots in the Pine Point Neighborhood
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Springfield, MA 01103

RFP Engineering - Designer Services Rehabilitation of Magazine Park
Infrastructure
Post-Bid
$1,200,000 CJ est. value
Springfield, MA 01109

Feasibility Study for a New Police Station
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Westfield, MA 01085

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Holyoke Soldiers Home - Renovation/Replacement
Term Contract, Demolition, New Construction, Renovation, Infrastructure - 548,415 SF
Construction
$328,660,000 CJ est. value
Holyoke, MA 01040

Storefront Improvements - Electrical
Renovation
Construction
$6,885 CJ est. value
Springfield, MA 01103

Holiday Inn Express
Demolition, New Construction, Infrastructure - 63,735 SF
Pending Verification
$19,000,000 CJ est. value
West Springfield, MA 01089

Pilot Travel Center
New Construction, Infrastructure - 11,421 SF
Pending Verification
$2,000,000 CJ est. value
Chicopee, MA 01020

South Branch Parkway Culvert Improvements - City of Springfield
Infrastructure
Conception
$500,000 CJ est. value
Springfield, MA 01118

Last Updated 08/24/2023 10:02 PM
Project Title

Creation of Utility Line Right-of-Way and Road Access

Physical Address View project details and contacts
City, State (County) Holyoke, MA 01040   (Hampden County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope of work includes but is not limited to creating a 25-foot-wide access road within a 50-foot right-of-way easement area for the installation and maintenance of a utility pole line using utility line trucks to access the right-of-way (See attached survey route). The access road will be a permanent installation with little or no future maintenance. Work pads will be required at each pole location. Erosion and sediment controls are required, and locations will be determined by the Contractor and the designated HG&E person to properly protect surrounding resources and/or structures. Other requirements may be required based upon permits submitted to local and State authorities Create a 1200' x 25' right-of-way access road in Holyoke, MA. If any respective bidder is in doubt of the true meaning of any part of these specifications, plans, or proposed contract documents, he/she may submit a written request for an interpretation to: Chi Wong Holyoke Gas & Electric Dept. 99 Suffolk Street, Holyoke, MA 01040 Tel: (413) 335-0148 Email: cwong@hged.com Failure to observe this rule may be grounds for disqualification Scope of Work Create a 25-foot-wide access road within a 50-foot right-of-way easement area for the installation and maintenance of a utility pole line using utility line trucks to access the right-of-way (See attached survey route). The access road will be a permanent installation with little or no future maintenance. Work pads will be required at each pole location. Erosion and sediment controls are required, and locations will be determined by the Contractor and the designated HG&E person to properly protect surrounding resources and/or structures. Other requirements may be required based upon permits submitted to local and State authorities. Gravel will be installed with a minimum depth of six inches with a non-woven geotextile fabric underneath that allows water to pass for adequate drainage and not allow vegetation to flourish within the access road. Additional base material will be required for soft conditions and steep grade changes. Stumps will be cut down as low as practical but will remain in place to minimize erosion except as necessary for work pads, etc. A retaining wall may be necessary along the hillside parallel to the existing buildings to eliminate the possibility of erosion due to the loss of flora in the area. Rip-rap slope protection or straw erosion netting will be installed for steep slopes. The right-of-way has already been cleared to the surveyed edges. Any vegetation management conducted by the contractor will be completed using the low impact tree clearing techniques following ANSI A-300, ANSI Z133, ORTM 030, and OSHA 29CFR 1910.269 standards.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents