Similar Projects
Wastewater Treatment Plant Rotor Repair
Post-Bid
Mercedes, TX 78570

Acton MUD TWDB CWSRF WWTP No. 1 Improvements
Post-Bid
Less than $7,000,000 est. value
Granbury, TX

Wastewater Treatment Plant Phase 1
Results
Less than $2,139,671 est. value
TX

Salitrillo Wastewater Treatment Plant Progressive Design Build Upgrades
Results
Less than $25,000,000 est. value
San Antonio, TX 78204

Waste Water Treatment Plant Improvements
Post-Bid
La Feria, TX 78559

Carters Creek Centrifuge Improvements
Results
Less than $3,900,000 est. value
Brazos, TX 77842

Highlands Wastewater Treatment Plant Phase I - 0.250 MGD
Post-Bid
Porter Heights, TX 77365

Dissolve Air Floatation Unit and Support Replacement
Results
Less than $299,000 est. value
San Antonio, TX 78200

Wastewater Treatment Plant Rehabilitation and Lift Station Conversion
Post-Bid
$1,365,000 est. value
Katy, TX 77449

North Corridor Consolidation Package 1
Results
Less than $23,837,012 est. value
Houston, TX 77000

2019 TXCDBG Wastewater Treatment Plant Improvements
Post-Bid
Franklin, TX 77856

Replace Bar Screen - WWTP
Results
Less than $262,500 est. value
Huntsville, TX 77320

0.120 MGD Wastewater Treatment Plant Project
Post-Bid
Woodloch, TX 77385

Manvel Town Center Wastewater Treatment Plant Phase 1
Results
TX

Waste Water Treatment Facility - Conversion to Liquid Chlorine
Post-Bid
Houston, TX 77001

Reported 01/19/2022 12:00 AM
Project Title

Purchase, Removal and Installation of Influent/Return and Aeration Basin Weir Gates

Physical Address View project details and contacts
City, State (County) Huntsville, TX 77340   (Walker County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Influent/Return Weir Gates Scope of Work 1. Set up bypass pumps, and manage bypass, for influent flow as well as return sludge flow and direct flow to aeration basin 1 and 2. 2. Need enough fuel on standby to keep bypass pumps running throughout the removal and installation of the weir gates. 3. Disassemble the old weir gates and remove them. 4. Provide and install four new 316 stainless-steel weir gates, matching the dimensions of the attached blueprints. Contractor will be responsible for verifying dimensions. 5. Clean work area and dispose of all removed parts. Aeration Basin Weir Gates Scope of Work 1. Set up a bypass pump, and mange bypass, going from the aeration basin to the clarifier splitter box. 2. Need enough fuel on standby to keep bypass pumps running throughout the removal and installation of the weir gates. 3. Disassemble the old weir gates and remove them. 4. Provide and install four new 316 stainless-steel weir gates, matching the dimensions of the attached blueprints. Contractor will be responsible for verifying dimensions. 5. Clean work area and dispose of all removed parts. 6. Turnkey project.

Details

Division 46 - Water and Wastewater Equipment, Air and Gas Diffusion Equipment, Jet Aeration Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents